Back to bathroom remodel contractors
Canyon Construction
- Based in
- Moraga
- On San Francisco permits
- Jan 2003 to Dec 2013
- Last 24 months
- 0 permits filed
32 permits since 2000: 23 completed, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 5 completed, 2 never finaled, 1 expired or cancelled. Typically 12 days from filing to permit and 447 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2013 | Completed final sign-off Apr 2017 | 2614 Buchanan St | unit #3-interior renovation of kitchen & bathroom, demolition of existing wall between kitchen & living room w/ new structurla beam, adding new laundry room (wash/dryer). new plumbing fixtures / appliances @ kitchen, bathroom & laundry.Details
unit #3-interior renovation of kitchen & bathroom, demolition of existing wall between kitchen & living room w/ new structurla beam, adding new laundry room (wash/dryer). new plumbing fixtures / appliances @ kitchen, bathroom & laundry. | $35,000 |
| Jul 9, 2013 | Never finaled issued Jul 2013, no final | 2691 35th Av | comply with complaint #201383545. interior remodel. new kitchen, remodel bathroom,remodel new windows and stucco at exterior. replace extg deck at rear, new sliding doors to deck at rear.Details
comply with complaint #201383545. interior remodel. new kitchen, remodel bathroom,remodel new windows and stucco at exterior. replace extg deck at rear, new sliding doors to deck at rear. | $400,000 |
| Apr 17, 2013 | Completed final sign-off May 2015 | 723 Lawton St | addition of approximately 350.62 sqft. including expansion of kitchen and adding a master bath.Details
addition of approximately 350.62 sqft. including expansion of kitchen and adding a master bath. | $100,000 |
| Apr 16, 2012 | Expired or cancelled expired Oct 2020 | 2614 Buchanan St | revision to appl #2011.07.01.9358 - revision per post demolition discoveries, interior renovation (kitchen & bath), window revisions to unit #2, interior renovation (kitchen & bath), add sink to unit #1.Details
revision to appl #2011.07.01.9358 - revision per post demolition discoveries, interior renovation (kitchen & bath), window revisions to unit #2, interior renovation (kitchen & bath), add sink to unit #1. | $300,000 |
| Feb 26, 2010 | Completed final sign-off Oct 2010 | 274 San Marcos Av | remove and replace kitchen cabinets, replace drywall on walls and ceiling, rework plumbing/elec for new fixtures and appliances,replace kitchen window, replace bath vanity cab, floor, lighting, replace kitchen floor. kitchen=180 sq. ft., power room=16 sq. t.Details
remove and replace kitchen cabinets, replace drywall on walls and ceiling, rework plumbing/elec for new fixtures and appliances,replace kitchen window, replace bath vanity cab, floor, lighting, replace kitchen floor. kitchen=180 sq. ft., power room=16 sq. t. | $40,000 |
| May 1, 2008 | Completed final sign-off Nov 2009 | 100 Buena Vista Tr | one story rear addition w/deck above. remodel kitchen,dining 2nd fl. add shelves,library,closets at lounge & remove bathroom @ 3rd fl. add new vanity,closet & windows 4th fl. new retaining wall & stairs at rear. new trellis @ 4th.Details
one story rear addition w/deck above. remodel kitchen,dining 2nd fl. add shelves,library,closets at lounge & remove bathroom @ 3rd fl. add new vanity,closet & windows 4th fl. new retaining wall & stairs at rear. new trellis @ 4th. | $325,000 |
| Aug 30, 2007 | Never finaled issued Sep 2007, no final | 530 Funston Av | revision to pa# 2007.08.13.9551. all work on basement level. convert full bath room to half bath. keep (e) exterior doors and windows. keep (e) location of door btn garage and storage room. move door from staircase.Details
revision to pa# 2007.08.13.9551. all work on basement level. convert full bath room to half bath. keep (e) exterior doors and windows. keep (e) location of door btn garage and storage room. move door from staircase. | |
| Aug 13, 2007 | Completed final sign-off Nov 2007 | 530 Funston Av | create habitable space in the lowest story by converting about 409 square feet of unconditioned space - 367 sf for a home office and about 42 sf for a bathroom.Details
create habitable space in the lowest story by converting about 409 square feet of unconditioned space - 367 sf for a home office and about 42 sf for a bathroom. | $60,000 |