Back to kitchen remodel contractors
Candito Construction
- Based in
- Pacifica
- On San Francisco permits
- Jan 2000 to Oct 2010
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2009 | Completed final sign-off Mar 2010 | 292 San Jose Av | comply with physical inspection report #cc5652. install sunlite tube @ kitchen-22" dia. 5ft. from prop. line.Details
comply with physical inspection report #cc5652. install sunlite tube @ kitchen-22" dia. 5ft. from prop. line. | $21,000 |
| Feb 27, 2009 | Expired or cancelled expired Nov 2018 | 535 14th Av | interior remodeling only. remodel kitchen & bath in same location on 2nd floor.Details
interior remodeling only. remodel kitchen & bath in same location on 2nd floor. | $35,000 |