Back to kitchen remodel contractors
Campillo Builders Inc
- Based in
- Pacifica
- On San Francisco permits
- Mar 2021 to Mar 2021
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 180 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2021 | Never finaled issued Sep 2021, no final | 2458 Vallejo St | kitchen remodel with no plumbing location changes. 2 bathrooms remodel with plumbing location changes. minor wall changes including new headers. renovate 2 (e) gas fireplaces. (n) wood flooring. electrical upgrades.Details
kitchen remodel with no plumbing location changes. 2 bathrooms remodel with plumbing location changes. minor wall changes including new headers. renovate 2 (e) gas fireplaces. (n) wood flooring. electrical upgrades. | $500,000 |