Back to kitchen remodel contractors
Calsystem Restoration Services Inc
- Based in
- Oakland
- On San Francisco permits
- Aug 2015 to Oct 2025
- Last 24 months
- 2 permits filed
6 permits since 2000: 5 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 in progress. Typically 14 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2025 | In progress issued Mar 2026 | 1101 Geneva Av | fire damage with in-kind repairs. all work will be completed to return the house to original conditions, including removal and replacement of the damaged (roof faming, interior and exterior finishes, electrical wiring, windows and doors, kitchen and bath fixtures, insulation, fau and water heater).Details
fire damage with in-kind repairs. all work will be completed to return the house to original conditions, including removal and replacement of the damaged (roof faming, interior and exterior finishes, electrical wiring, windows and doors, kitchen and bath fixtures, insulation, fau and water heater). | $502,204 |
| Oct 17, 2025 | Completed final sign-off Jun 2026 | 290 Santa Rosa Av | to comply with nov 2025-34272. minor interior alteration. adding new half bath, relocating bedroom closets, opening kitchen to dining room, redesign kitchen layout, modify stairs for headroom clearance, replace windows and doors in-kind at existing openings, new roof to replace existing.Details
to comply with nov 2025-34272. minor interior alteration. adding new half bath, relocating bedroom closets, opening kitchen to dining room, redesign kitchen layout, modify stairs for headroom clearance, replace windows and doors in-kind at existing openings, new roof to replace existing. | $125,000 |
| Aug 13, 2015 | Completed final sign-off Jan 2016 | 283 Concord St | to rewire electrical,to install new central heating unit, to insulate all exterior walls, to install new drywall,repair all damage caused by fire in bedrm #1,kitchen,living rm & hallways,no structural work(fire damaged repair only)Details
to rewire electrical,to install new central heating unit, to insulate all exterior walls, to install new drywall,repair all damage caused by fire in bedrm #1,kitchen,living rm & hallways,no structural work(fire damaged repair only) | $80,000 |