Back to kitchen remodel contractors
Calisco Builders
- Based in
- Concord
- On San Francisco permits
- Jul 2011 to Jun 2012
- Last 24 months
- 0 permits filed
5 permits since 2000: 1 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 41 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2012 | Completed final sign-off Jul 2012 | 6271 03rd St | kitchen-remove sheetrock for electrical work. hall closet- remove sheetrock to install electrical panel. electric room- frame for main electrical panel, sheetrock, fire tape and fire caulk. install new sheetrock at opening in kitchen and hall closet, tape & top ready for painting.Details
kitchen-remove sheetrock for electrical work. hall closet- remove sheetrock to install electrical panel. electric room- frame for main electrical panel, sheetrock, fire tape and fire caulk. install new sheetrock at opening in kitchen and hall closet, tape & top ready for painting. | $7,000 |
| Apr 4, 2012 | Expired or cancelled cancelled Dec 2012 | 1051 De Haro St | light remodel #a,b,c-upgrade electrical fixtures, new recessed lighting, upgrade subpanels, all fixtures in bathrooms, living rooms & kitchen for all units. upgrade/replace exterior fixtures, upgrade plumbing where needed- leaking shutoff valves, supply lines, toilets.Details
light remodel #a,b,c-upgrade electrical fixtures, new recessed lighting, upgrade subpanels, all fixtures in bathrooms, living rooms & kitchen for all units. upgrade/replace exterior fixtures, upgrade plumbing where needed- leaking shutoff valves, supply lines, toilets. | $50,000 |