California Design And Construction
- Based in
- Las Vegas
- On San Francisco permits
- Apr 2000 to Jun 2004
- Last 24 months
- 0 permits filed
17 permits since 2000: 13 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 325 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2003 | Expired or cancelled expired Dec 2006 | 306 Diamond St | repair (e) sunporch, replace stairs to back yard, remodel kitchenDetails
repair (e) sunporch, replace stairs to back yard, remodel kitchen | $22,000 |
| Dec 12, 2000 | Completed final sign-off Nov 2001 | 245 Connecticut St | repair damaged treads & riser on stairs inside home to top story unit. replace fixts & tile in existDetails
repair damaged treads & riser on stairs inside home to top story unit. replace fixts & tile in exist | $3,400 |