Back to bathroom remodel contractors
California Construction Center Inc
- Based in
- San Jose
- On San Francisco permits
- Mar 2018 to Nov 2023
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2023 | In progress issued Nov 2023 | 2330 Diamond St | kitchen remodel (wall removal) master bath remodel. 1st/f: bath remodel, 2nd/f: bath remodel, creare laundry area, cancel 2 windows & 1 door. new sliding door (instead of window).Details
kitchen remodel (wall removal) master bath remodel. 1st/f: bath remodel, 2nd/f: bath remodel, creare laundry area, cancel 2 windows & 1 door. new sliding door (instead of window). | $315,000 |
| Apr 26, 2023 | Completed final sign-off Jan 2026 | 36 Blair Tr | bathroom remodel: replace vanity, replace toilet, replace tub, new receps, lights (3), new gfci, install new exhause fan. install switches, install new light fixture. no structural work, no exterior work.Details
bathroom remodel: replace vanity, replace toilet, replace tub, new receps, lights (3), new gfci, install new exhause fan. install switches, install new light fixture. no structural work, no exterior work. | $27,000 |
| Apr 6, 2022 | Never finaled issued Apr 2022, no final | 11 High St | unit #201: non structural. master bathroom remodeling- replace vanity, toilet (bidet), convert tub to shower, replace exhaust fan, 2 gfci, add 3 recess lights and 2 light fixture. guest bath remodel- replace vanity, toilet (bidet), convert tub, add 3 recess lights, gfci, light fixture.Details
unit #201: non structural. master bathroom remodeling- replace vanity, toilet (bidet), convert tub to shower, replace exhaust fan, 2 gfci, add 3 recess lights and 2 light fixture. guest bath remodel- replace vanity, toilet (bidet), convert tub, add 3 recess lights, gfci, light fixture. | $57,500 |
| Apr 15, 2021 | Completed final sign-off Jun 2021 | 491 Gold Mine Dr | master bathroom (1 of 2) remodel in kind. convert tub to shower. powder room remodel in kind. no structural changes.Details
master bathroom (1 of 2) remodel in kind. convert tub to shower. powder room remodel in kind. no structural changes. | $33,000 |
| Oct 31, 2019 | Completed final sign-off Jan 2020 | 1775 Quesada Av | partial bathroom remodeling 50 sqft. convert tub to showerDetails
partial bathroom remodeling 50 sqft. convert tub to shower | $10,000 |
| Feb 12, 2019 | Completed final sign-off Mar 2019 | 2631 47th Av | remodel bathroom like for like. one new exhaust fan. in kitchen- new exhaust fan to be installed. panel box to replace with larger panel box. no change to walls.Details
remodel bathroom like for like. one new exhaust fan. in kitchen- new exhaust fan to be installed. panel box to replace with larger panel box. no change to walls. | $22,000 |
| Nov 14, 2018 | Completed final sign-off Jan 2019 | 1477 Kansas St | bathroom remodel. wall removel, (n) lights, (n) fan, (n) switches and receptacles, plumbing relocationDetails
bathroom remodel. wall removel, (n) lights, (n) fan, (n) switches and receptacles, plumbing relocation | $26,700 |
| Apr 19, 2018 | Completed final sign-off Jul 2018 | 5900 03rd St | #2301: bathroom remodeling, convert tub to shower, new switch, new fan, recessed light (1), wall mount light (1). no walls moved, removed, added or infilled. all existing layouts to remain unchanged. maher naDetails
#2301: bathroom remodeling, convert tub to shower, new switch, new fan, recessed light (1), wall mount light (1). no walls moved, removed, added or infilled. all existing layouts to remain unchanged. maher na | $21,000 |
| Mar 15, 2018 | Completed final sign-off Jul 2018 | 319 Arlington St | interior remodl of both units 319 & 321 to add 1 new bath in each unit. infill portions of (e) non-load bearing walls and add 2 new door openings into walls in each unit. no exterior modifications or changes to bldg envelopeDetails
interior remodl of both units 319 & 321 to add 1 new bath in each unit. infill portions of (e) non-load bearing walls and add 2 new door openings into walls in each unit. no exterior modifications or changes to bldg envelope | $35,000 |