Block 2849, lot 033
11 High St
- City’s use
- Single Family Residential
- Built
- 1980
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,208 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
3 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2025 | Completed final sign-off May 2026 | 11 High St | Dream Build Services Llc | unit 201- remodel (e) bathrooms like for like. (n) exhaust fans and lights included. tile showers and floor. no wall removal or layout changes. include converting tub to shower. built prior to 1991Details
unit 201- remodel (e) bathrooms like for like. (n) exhaust fans and lights included. tile showers and floor. no wall removal or layout changes. include converting tub to shower. built prior to 1991 | $35,000 |
| Apr 6, 2022 | Never finaled issued Apr 2022, no final | 11 High St | California Construction Center Inc | unit #201: non structural. master bathroom remodeling- replace vanity, toilet (bidet), convert tub to shower, replace exhaust fan, 2 gfci, add 3 recess lights and 2 light fixture. guest bath remodel- replace vanity, toilet (bidet), convert tub, add 3 recess lights, gfci, light fixture.Details
unit #201: non structural. master bathroom remodeling- replace vanity, toilet (bidet), convert tub to shower, replace exhaust fan, 2 gfci, add 3 recess lights and 2 light fixture. guest bath remodel- replace vanity, toilet (bidet), convert tub, add 3 recess lights, gfci, light fixture. | $57,500 |
| Sep 18, 2013 | Completed final sign-off Mar 2014 | 11 High St | to comply with nov #201311151 dated 7/16/13. three doors installed: 1) in entry to living room, additional bath door installed. 2)door to entry to conserve heat installed. 3)door between bedrooms installed. partition over bathroom door in hallway pushed out(not nailed in) removed stoveDetails
to comply with nov #201311151 dated 7/16/13. three doors installed: 1) in entry to living room, additional bath door installed. 2)door to entry to conserve heat installed. 3)door between bedrooms installed. partition over bathroom door in hallway pushed out(not nailed in) removed stove | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- California Construction Center Inc, Dream Build Services Llc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.