California Concepts Construction

Contractor license
596541
State license record
Based in
San Francisco
On San Francisco permits
Feb 2000 to Jun 2019
Last 24 months
0 permits filed

56 permits since 2000: 33 completed, 4 never finaled, 19 expired or cancelled.

Of the 4 never-finaled permits, 4 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 5Stairs 6Kitchen remodel 5Bathroom remodel 6

6 stairs permits: 4 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 118 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 21, 2016Completed
final sign-off Dec 2016
50 Walter Strevision to pa 2016-0520-7966 to show correct (e) west elevation. repair (e) stairs, less than 50%
Details
Permit
201607212946
Status
complete
Filed
Jul 21, 2016
Permit issued
Jul 25, 2016
Final sign-off
Dec 24, 2016
Address
50 Walter St

revision to pa 2016-0520-7966 to show correct (e) west elevation. repair (e) stairs, less than 50%

Open the permit page

May 20, 2016Completed
final sign-off Dec 2016
50 Walter Strepair existing stair, proposed repairs are limited to less than 50%, contact building inspector for pre-construction meeting.
Details
Permit
201605207966
Status
complete
Filed
May 20, 2016
Permit issued
May 20, 2016
Final sign-off
Dec 24, 2016
Declared cost
$7,200
Address
50 Walter St

repair existing stair, proposed repairs are limited to less than 50%, contact building inspector for pre-construction meeting.

Open the permit page

$7,200
Apr 25, 2016Expired or cancelled
withdrawn Jul 2016
50 Walter Stexact replacement stair, same location & dimensions, repair water damage at laundries.
Details
Permit
201604255638
Status
withdrawn
Filed
Apr 25, 2016
Declared cost
$5,000
Address
50 Walter St

exact replacement stair, same location & dimensions, repair water damage at laundries.

Open the permit page

$5,000
Jun 23, 2014Completed
final sign-off Jul 2014
466 Oak Stcorrect dryrot damage at exterior wooden entry stairs. repair less than 50% extg structure. no change/modification of extg appearance.
Details
Permit
201406239157
Status
complete
Filed
Jun 23, 2014
Permit issued
Jun 23, 2014
Final sign-off
Jul 18, 2014
Declared cost
$4,500
Address
466 Oak St

correct dryrot damage at exterior wooden entry stairs. repair less than 50% extg structure. no change/modification of extg appearance.

Open the permit page

$4,500
Aug 20, 2003Expired or cancelled
expired Jan 2005
107 Crestmont Drremove existing concrete stair unit & replace with new steel fabed unit
Details
Permit
200308202564
Status
expired
Filed
Aug 20, 2003
Permit issued
Aug 20, 2003
Declared cost
$10,000
Address
107 Crestmont Dr

remove existing concrete stair unit & replace with new steel fabed unit

Open the permit page

$10,000
Aug 5, 2003Completed
final sign-off Oct 2003
60 Pinehurst Wyreplace e stair w/ dryrot at front of house
Details
Permit
200308051245
Status
complete
Filed
Aug 5, 2003
Permit issued
Aug 5, 2003
Final sign-off
Oct 28, 2003
Declared cost
$8,500
Address
60 Pinehurst Wy

replace e stair w/ dryrot at front of house

Open the permit page

$8,500