Back to kitchen remodel contractors
Calidad Construction
- Based in
- Vallejo
- On San Francisco permits
- Dec 2014 to Sep 2024
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 1 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2024 | Completed final sign-off Oct 2024 | 2654 Greenwich St | unit 2654 greenwich street: kitchen remove existing counter top and back splash, install nw countertop and backsplash, install new sink, faucet, garbage disposal. install new can led light (4). livingroom install 1 dimable switch. living room install 6 new led can lights.Details
unit 2654 greenwich street: kitchen remove existing counter top and back splash, install nw countertop and backsplash, install new sink, faucet, garbage disposal. install new can led light (4). livingroom install 1 dimable switch. living room install 6 new led can lights. | $18,100 |