Caliber Carpentry Inc
- Based in
- San Pablo
- On San Francisco permits
- Feb 2020 to Aug 2025
- Last 24 months
- 1 permit filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 7 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2021 | Completed final sign-off Mar 2021 | 1869 Turk St | remove existing 2x6 decking assess condition of joists. repair 2 replace rotten joists with pt 2x10 or equivalant to existing. flash joist and sidding re-install 2x6 redwood decking. dock approx size of 6x20 repair in less than 50%Details
remove existing 2x6 decking assess condition of joists. repair 2 replace rotten joists with pt 2x10 or equivalant to existing. flash joist and sidding re-install 2x6 redwood decking. dock approx size of 6x20 repair in less than 50% | $13,500 |