Back to kitchen remodel contractors
Cal-Express Construction Co
- Based in
- Daly City
- On San Francisco permits
- Jul 2000 to May 2004
- Last 24 months
- 0 permits filed
15 permits since 2000: 5 completed, 10 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 7 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2003 | Completed final sign-off Aug 2003 | 369 Capp St | replace damaged matal base kitchen sink cabinet.repair/secure loose toilet at porch bathrm area.Details
replace damaged matal base kitchen sink cabinet.repair/secure loose toilet at porch bathrm area. | $4,800 |
| Dec 14, 2000 | Expired or cancelled expired Jun 2001 | 88 Whitney St | remodel kitchen, remove/replace (e) cabinets; floor, install sink, replace (n)outlets w/wiringDetails
remodel kitchen, remove/replace (e) cabinets; floor, install sink, replace (n)outlets w/wiring | $8,740 |