Cal C A D E Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Sep 2026
- Last 24 months
- 8 permits filed
175 permits since 2000: 142 completed, 8 in progress, 11 never finaled, 14 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 8 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 14 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2026 | In progress filed Mar 2026, not yet issued | 732 Brannan St | soft demo of interior t.i. of 2 story building including fixtures (light), dropped ceiling, hvac, non structural partial height partitions. front stair to 2nd floor to be removed. rear stair & elevator to remain. no exterior work & no structural work.Details
soft demo of interior t.i. of 2 story building including fixtures (light), dropped ceiling, hvac, non structural partial height partitions. front stair to 2nd floor to be removed. rear stair & elevator to remain. no exterior work & no structural work. | $11,200 |
| Oct 8, 2021 | Expired or cancelled withdrawn Apr 2024 | 1760 Fell St | repair replacement of street facing facades and stair. replace front and side windows. raise front parapet by 18" with addition of cornice. rebuilt exist. retaining wall against the sidewalk along the front property lineDetails
repair replacement of street facing facades and stair. replace front and side windows. raise front parapet by 18" with addition of cornice. rebuilt exist. retaining wall against the sidewalk along the front property line | $30,000 |
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 364 Bush St | install 1 hour fire rated lobby and 1 hour fire rated door at bottom of stairs in basement. install early fire detection alarm in basement install 3" fire hose valve at top of the stairs and make extg fire chase accessible. all of the above is agreed as per ab005 with reference to app#201712065620Details
install 1 hour fire rated lobby and 1 hour fire rated door at bottom of stairs in basement. install early fire detection alarm in basement install 3" fire hose valve at top of the stairs and make extg fire chase accessible. all of the above is agreed as per ab005 with reference to app#201712065620 | $1,500 |
| May 14, 2018 | Completed final sign-off Feb 2019 | 1458 Howard St | ti- new offices and storage. (e) accessible restrooms, breakrooms, stairs and ramps to remain (no change) mep/fire fdefferrred maher naDetails
ti- new offices and storage. (e) accessible restrooms, breakrooms, stairs and ramps to remain (no change) mep/fire fdefferrred maher na | $150,000 |
| Apr 25, 2018 | Completed final sign-off Mar 2019 | 1251 Howard St | revision to permit 201802221927. omit 3-hr fire doors, making building completely sprinklered to increase allowable area. remove stairs to mezzanine, from 2 showers to 1 shower. add parition wall at break room. sprinklers, fire alarm, mep separte permitDetails
revision to permit 201802221927. omit 3-hr fire doors, making building completely sprinklered to increase allowable area. remove stairs to mezzanine, from 2 showers to 1 shower. add parition wall at break room. sprinklers, fire alarm, mep separte permit | |
| May 5, 2015 | Completed final sign-off Feb 2016 | 1920 Broderick St | foundation repair: excavation on 1st floor. relocate interior stair from 1st to 2nd floor. kitchen and bath remodel on 2nd and 3rd floors. new rear windows and door. upgrade all structural, mechanical and electrical services to accomodate all above mentioned alterations. no facade work visible fromDetails
foundation repair: excavation on 1st floor. relocate interior stair from 1st to 2nd floor. kitchen and bath remodel on 2nd and 3rd floors. new rear windows and door. upgrade all structural, mechanical and electrical services to accomodate all above mentioned alterations. no facade work visible from | $175,000 |
| Jun 3, 2014 | Completed final sign-off Jun 2014 | 340 Lombard St | to obtain final inspection for work approved under app#201103031301. all work is complete. add new exterior stair from 2nd floor to the west side yardDetails
to obtain final inspection for work approved under app#201103031301. all work is complete. add new exterior stair from 2nd floor to the west side yard | |
| Mar 11, 2013 | Completed final sign-off Oct 2013 | 2513 Pacific Av | interior demo of (e) kitchen, back stair from 2nd to 3rd fl, interior walls, interior remodel of kitchen, 2 bathrooms, new pantry, partial new stair (reconfigured), new handrails, guarddrails, closets, storage room and new fireplace, surround & mantel.Details
interior demo of (e) kitchen, back stair from 2nd to 3rd fl, interior walls, interior remodel of kitchen, 2 bathrooms, new pantry, partial new stair (reconfigured), new handrails, guarddrails, closets, storage room and new fireplace, surround & mantel. | $190,000 |
| Dec 10, 2012 | Never finaled issued Dec 2012, no final | 874 Chestnut St | documentation of the removal of exterior stair for item #7 & 8 per physical inspection report cc-7150. no cfc.Details
documentation of the removal of exterior stair for item #7 & 8 per physical inspection report cc-7150. no cfc. | |
| Oct 9, 2012 | Completed final sign-off Nov 2014 | 3871 Jackson St | interior remodel to (e) 3 story basement. new lighting, finishes, plumbing throughout. 2 new full bathrooms, kitchen remodel, sykylights, move garage doors forward, new front door, remove exterior stair at side property.new sprinkler sprinkler on separate permit, seismic upgrades. windows.Details
interior remodel to (e) 3 story basement. new lighting, finishes, plumbing throughout. 2 new full bathrooms, kitchen remodel, sykylights, move garage doors forward, new front door, remove exterior stair at side property.new sprinkler sprinkler on separate permit, seismic upgrades. windows. | $150,000 |
| Jun 17, 2011 | Completed final sign-off Mar 2013 | 548 Douglass St | kitchen remodel, alterations to e bathroom, 2 e bedrooms, new stair (interior) 2nd floor to garage. add 1 new bath at 2nd fl, rebuild front entrance stair, selectrive structural repair of posts and footings, replace portions of failed foundation, add plywood shearwalls, and holddownsDetails
kitchen remodel, alterations to e bathroom, 2 e bedrooms, new stair (interior) 2nd floor to garage. add 1 new bath at 2nd fl, rebuild front entrance stair, selectrive structural repair of posts and footings, replace portions of failed foundation, add plywood shearwalls, and holddowns | $175,000 |
| Aug 6, 2010 | Completed final sign-off Apr 2011 | 350 College Av | replace front stairs, front steps in kind.Details
replace front stairs, front steps in kind. | $10,000 |