Back to kitchen remodel contractors
Cal-Bay Craftsmen Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Mar 2021
- Last 24 months
- 0 permits filed
11 permits since 2000: 8 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 54 days from filing to permit and 1311 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2018 | Completed final sign-off Feb 2024 | 439 Jersey St | interior remodel of kitchen, bathroom, dining and living room. upgrade electrical lighting. new sliding door and window at rear of bldgDetails
interior remodel of kitchen, bathroom, dining and living room. upgrade electrical lighting. new sliding door and window at rear of bldg | $120,000 |
| Sep 13, 2017 | Completed final sign-off Dec 2022 | 1415 Sanchez St | convert 1st flr storage to living space, merge 2nd & 3rd flr, relocate 1 unit to 1st flr inc (n) kitchen & bath. add attached garage at side alley & raise bldg to allow access. rear addition & deck. relocate & renovate kit @ 2nd flr, delete full bath & install 1/2 bath, 2 new baths @ 3rd flr.Details
convert 1st flr storage to living space, merge 2nd & 3rd flr, relocate 1 unit to 1st flr inc (n) kitchen & bath. add attached garage at side alley & raise bldg to allow access. rear addition & deck. relocate & renovate kit @ 2nd flr, delete full bath & install 1/2 bath, 2 new baths @ 3rd flr. | $650,000 |
| Aug 29, 2017 | Completed final sign-off Nov 2017 | 34 Winfield St | replace kitchen in kind, demo down to studss. replace kitchen cabinets and countertops, upgrading electrical and plumbing. installing new wood floors. replace master bath tub and tub faucetDetails
replace kitchen in kind, demo down to studss. replace kitchen cabinets and countertops, upgrading electrical and plumbing. installing new wood floors. replace master bath tub and tub faucet | $40,000 |