Back to kitchen remodel contractors
Cabano
- Based in
- South San Francisco
- On San Francisco permits
- May 2005 to May 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2008 | Completed final sign-off Jul 2008 | 56 Rockwood Ct | 2nd floor: kitchen remodel, no lighting: replace sink/faucet and 4 cabinets, new countertops, new electric oven and painting.Details
2nd floor: kitchen remodel, no lighting: replace sink/faucet and 4 cabinets, new countertops, new electric oven and painting. | $14,200 |
| Nov 17, 2006 | Completed final sign-off Feb 2007 | 951 Leavenworth St | remove & replace kitchen cabinets. 5/8" type "x" gyp board between unit & @ property line wall. remove plaster walls. replace gyp board new vinyl flooring. paint entire room. install owner supply appliances, flourescent lighting.Details
remove & replace kitchen cabinets. 5/8" type "x" gyp board between unit & @ property line wall. remove plaster walls. replace gyp board new vinyl flooring. paint entire room. install owner supply appliances, flourescent lighting. | $11,400 |