Back to kitchen remodel contractors
C-Square Inc
- Based in
- Millbrae
- On San Francisco permits
- Dec 2000 to Feb 2021
- Last 24 months
- 0 permits filed
60 permits since 2000: 48 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 0 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2019 | Completed final sign-off Apr 2020 | 282 Linden St | replace two (2) front windows at lower level in-kind w/all wood marvin ultimate double-hung windows w/in (e) openings. windows to have integrated ogees (no screw-ons). reface existing kitchen and bathroom finishes. one over one light pattern, o.g. lugs. kitchen & bath remodel. no other work.Details
replace two (2) front windows at lower level in-kind w/all wood marvin ultimate double-hung windows w/in (e) openings. windows to have integrated ogees (no screw-ons). reface existing kitchen and bathroom finishes. one over one light pattern, o.g. lugs. kitchen & bath remodel. no other work. | $25,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 995 Sanchez St | remodel 1st fl studio apt including kitchen remodel & bath relocation to create 1 bedroom unit. add new laundry on grnd/flr install new window in bedroom & relocate apt entryDetails
remodel 1st fl studio apt including kitchen remodel & bath relocation to create 1 bedroom unit. add new laundry on grnd/flr install new window in bedroom & relocate apt entry | $95,000 |
| Oct 18, 2017 | Completed final sign-off Jan 2018 | 614 Buchanan St | remove and replace 3 front double hung windows. replace in kind with marvin ultimate insert double hung wood window. replace one kitchen, one bathroom window in kind using marvin ultimate insert double hung windows aluminum clad wood for bathroom & kitchen. n/a for maher.Details
remove and replace 3 front double hung windows. replace in kind with marvin ultimate insert double hung wood window. replace one kitchen, one bathroom window in kind using marvin ultimate insert double hung windows aluminum clad wood for bathroom & kitchen. n/a for maher. | $10,000 |
| Apr 20, 2015 | Completed final sign-off Nov 2015 | 183 Juanita Wy | remove and replace kitchen in kind. new cabinets, counter tops, appliances, hardwood floor. no opening changes, no fixture locations changes.Details
remove and replace kitchen in kind. new cabinets, counter tops, appliances, hardwood floor. no opening changes, no fixture locations changes. | $25,000 |
| Jan 30, 2013 | Completed final sign-off Feb 2014 | 2675 Lombard St | remove & replace existing bathroom, no new walls, fixture locations to remain, to tile, tub,toilet,vanity. remove & repalce kitchen countertops only. no lighting change.Details
remove & replace existing bathroom, no new walls, fixture locations to remain, to tile, tub,toilet,vanity. remove & repalce kitchen countertops only. no lighting change. | $15,000 |
| May 17, 2012 | Completed final sign-off Feb 2013 | 241 Tocoloma Av | remodel of extg kitchen, dining room, new stairs to lower floor, mech room and laundry.Details
remodel of extg kitchen, dining room, new stairs to lower floor, mech room and laundry. | $110,000 |
| Mar 19, 2012 | Completed final sign-off Apr 2012 | 2762 Pine St | remove and replace water damaged ceiling over kitchen approx 200 sq.ft. of drywallDetails
remove and replace water damaged ceiling over kitchen approx 200 sq.ft. of drywall | $5,000 |
| Oct 14, 2010 | Completed final sign-off Feb 2011 | 1729 Stockton St | remodeling of existing bathroom, remove wall in kitchen and electrical work in living & dining roomDetails
remodeling of existing bathroom, remove wall in kitchen and electrical work in living & dining room | $20,000 |
| Mar 18, 2008 | Completed final sign-off Aug 2008 | 158 Clipper St | remove and replace kitchen countertops. remove and replace wndw over sink. reduce wndw framing to counter of sink and counter. infill exterior siding as necessary, match extgDetails
remove and replace kitchen countertops. remove and replace wndw over sink. reduce wndw framing to counter of sink and counter. infill exterior siding as necessary, match extg | $7,500 |
| Nov 20, 2003 | Completed final sign-off Feb 2004 | 2150 12th Av | remove &replace kitchen cabinets & counters.update elec circuits&light per code.r/r sheetrock on2/flDetails
remove &replace kitchen cabinets & counters.update elec circuits&light per code.r/r sheetrock on2/fl | $10,000 |
| May 24, 2002 | Completed final sign-off Sep 2002 | 175 Castenada Av | remove & replace kitchen cabinets, upgrade electrical serviceDetails
remove & replace kitchen cabinets, upgrade electrical service | $25,000 |