Back to bathroom remodel contractors
C N A Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to Jul 2026
- Last 24 months
- 6 permits filed
86 permits since 2000: 70 completed, 2 in progress, 13 never finaled, 1 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 13 completed, 2 in progress, 8 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 560 Natoma St | revision to pa# 202605040608: 2/f- replace kitchen cabinets, countertops, and appliances. replace laundry and shower in bathroom - all same locations.Details
revision to pa# 202605040608: 2/f- replace kitchen cabinets, countertops, and appliances. replace laundry and shower in bathroom - all same locations. | $30,000 |
| May 4, 2026 | In progress issued May 2026 | 560 Natoma St | first floor: replace drywall on walls and ceiling. replace utility sink. second floor: replace drywall on ceilings and walls. replace bathroom sink and relocate toilet. replace coffee sink in kitchen. install 3 space heaters. no structural workDetails
first floor: replace drywall on walls and ceiling. replace utility sink. second floor: replace drywall on ceilings and walls. replace bathroom sink and relocate toilet. replace coffee sink in kitchen. install 3 space heaters. no structural work | $76,000 |
| Aug 14, 2025 | Completed final sign-off Apr 2026 | 556 Natoma St | kitchen and bathrooms remodeling in kind, same location, no change to floor layout, no change to wall layout, no structural work, maintain existing fire rating and seperation between units.Details
kitchen and bathrooms remodeling in kind, same location, no change to floor layout, no change to wall layout, no structural work, maintain existing fire rating and seperation between units. | $72,500 |
| May 15, 2025 | Completed final sign-off Jan 2026 | 558 Natoma St | (unit: 558a natoma st) - kitchen and bathroom remodeling in kind. same locations. no change to floor layout. no change to wall layout. no structural work. maintain (e) fire rating and separation between units.Details
(unit: 558a natoma st) - kitchen and bathroom remodeling in kind. same locations. no change to floor layout. no change to wall layout. no structural work. maintain (e) fire rating and separation between units. | $50,000 |
| Aug 14, 2024 | Completed final sign-off Jun 2025 | 1688 Sanchez St | repair and patch holes on walls ceilings in hallways and bedrooms.remodel kitchen and bathroom. same location. no layout changes or wall modifications. no structural work.Details
repair and patch holes on walls ceilings in hallways and bedrooms.remodel kitchen and bathroom. same location. no layout changes or wall modifications. no structural work. | $25,000 |
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 609 Oak St | remodel kitchen & 2 bathrooms in-kind in same location.Details
remodel kitchen & 2 bathrooms in-kind in same location. | $40,000 |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 88 Castro St | install new fan in bathroom to comply with his nov's #201964211-item 7, 201970653-item 5 & repair stairs in-kind, less than 50%Details
install new fan in bathroom to comply with his nov's #201964211-item 7, 201970653-item 5 & repair stairs in-kind, less than 50% | $16,500 |
| Jul 25, 2018 | Never finaled issued Sep 2018, no final | 395 Frederick St | on 2nd floor - apartment 4 - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent)Details
on 2nd floor - apartment 4 - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent) | $30,000 |
| Jul 25, 2018 | Never finaled issued Aug 2018, no final | 395 Frederick St | apartment 6 - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent)Details
apartment 6 - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent) | $30,000 |
| Jul 25, 2018 | Never finaled issued Aug 2018, no final | 395 Frederick St | apartment 2 on ground floor - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent)Details
apartment 2 on ground floor - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent) | $30,000 |
| Jun 1, 2018 | Expired or cancelled cancelled Feb 2024 | 1159 Fitzgerald Av | 2-story addition. 1st story: new powder bathroom & storage. 2nd story: new powder bathroom & laundry. comply with nov #201707363.Details
2-story addition. 1st story: new powder bathroom & storage. 2nd story: new powder bathroom & laundry. comply with nov #201707363. | $25,000 |
| Aug 21, 2017 | Completed final sign-off Nov 2017 | 2661 California St | complete kitchen remodel ,same location add 4 recessed lights, bathroom r,eplace toilet, vanity, floor tile , add 2 recessed lights in unit # 11 onlyDetails
complete kitchen remodel ,same location add 4 recessed lights, bathroom r,eplace toilet, vanity, floor tile , add 2 recessed lights in unit # 11 only | $35,000 |
| May 25, 2017 | Completed final sign-off Feb 2018 | 52 Webster St | remodel (e) kitchen and bathroom (same location & sizes) new finishes & appliances. replace 2 (e) wood burning fire places w/new direct vent fire places. add 2 more direct vent fireplaces (total 5). no structural work.Details
remodel (e) kitchen and bathroom (same location & sizes) new finishes & appliances. replace 2 (e) wood burning fire places w/new direct vent fire places. add 2 more direct vent fireplaces (total 5). no structural work. | $40,000 |
| Dec 23, 2016 | Completed final sign-off Aug 2017 | 83 Walter St | apt #r: kitchen and bathroom remodel & the installation of 3 fire places.Details
apt #r: kitchen and bathroom remodel & the installation of 3 fire places. | $30,000 |
| Nov 30, 2016 | Never finaled issued Nov 2016, no final | 561 Baker St | revision to app# 201510169982, remove scope of work ,not to remove legal window in bathroom of unit 4 on second floor.Details
revision to app# 201510169982, remove scope of work ,not to remove legal window in bathroom of unit 4 on second floor. | |
| May 23, 2016 | Never finaled issued May 2016, no final | 3517 Sacramento St | remove (e) tile/linoleum in bathroom floor only install new ceramic tile.Details
remove (e) tile/linoleum in bathroom floor only install new ceramic tile. | $3,500 |
| Jan 15, 2016 | Completed final sign-off May 2016 | 1902 Page St | unit #1-remodel existing kitchen and bath, replace all fixtures and water heater. new gas fireplace direct vent.Details
unit #1-remodel existing kitchen and bath, replace all fixtures and water heater. new gas fireplace direct vent. | $30,000 |
| Jan 15, 2016 | Completed final sign-off Jul 2016 | 83 Walter St | unit f-remodel e kitchen and bath, replace all fixtures including water heater. new gas fire place direct vent.Details
unit f-remodel e kitchen and bath, replace all fixtures including water heater. new gas fire place direct vent. | $28,000 |
| Oct 16, 2015 | Never finaled issued Feb 2016, no final | 561 Baker St | to comply with nov #200563868:#5 repair window sash frame,#6 remove bathroom windows installed w/o permit.#7repair/maintain fire escape drop ladder in working condition,#9repair garbage chute,#17install ventilation at bathrm & remove ligtwell infill,#26 obtain elec/plmb for gas fireplaces. maher n/aDetails
to comply with nov #200563868:#5 repair window sash frame,#6 remove bathroom windows installed w/o permit.#7repair/maintain fire escape drop ladder in working condition,#9repair garbage chute,#17install ventilation at bathrm & remove ligtwell infill,#26 obtain elec/plmb for gas fireplaces. maher n/a | $7,000 |
| Mar 25, 2015 | Completed final sign-off Jul 2015 | 2185 Bay St | unit #2: relocate kitchen and remodel bath - unit 2. interior renovation. n/a maher ordinance #155-13Details
unit #2: relocate kitchen and remodel bath - unit 2. interior renovation. n/a maher ordinance #155-13 | $28,000 |
| Mar 23, 2015 | Completed final sign-off May 2015 | 50 Webster St | bathroom remodel@ 50 webster. replace kitchen counter top @ 50 webster/192 hermann.Details
bathroom remodel@ 50 webster. replace kitchen counter top @ 50 webster/192 hermann. | $20,000 |
| Feb 11, 2015 | Completed final sign-off May 2015 | 192 Hermann St | 2 bathrooms remodel on second floor.Details
2 bathrooms remodel on second floor. | $12,000 |
| Jan 29, 2015 | Completed final sign-off Aug 2015 | 84 Pond St | install one new gas fireplace and one retrofit fireplace, replace existing cabinets with new cabinet. 1 kitchen remodel, gas fireplace, bathroom remodelingDetails
install one new gas fireplace and one retrofit fireplace, replace existing cabinets with new cabinet. 1 kitchen remodel, gas fireplace, bathroom remodeling | $9,000 |
| Jun 5, 2012 | Completed final sign-off Aug 2012 | 1611 Haight St | bathroom remodel-replace tub, sink, toilet. renew ceramic tile floor. no change on walls & openingsDetails
bathroom remodel-replace tub, sink, toilet. renew ceramic tile floor. no change on walls & openings | $6,000 |