Back to kitchen remodel contractors
C Max Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2024 to Jun 2026
- Last 24 months
- 6 permits filed
8 permits since 2000: 6 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 in progress. Typically 19 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2026 | In progress issued Jun 2026 | 144 Lakeview Av | 1st floor: 1)convert e offices into bedroom, add a bedroom, 2 bathrooms & kitchenette. 2)enclosed lightwell at right side of property, 3)relocate/upgrade elec. service to 200 amp. 4)2nd floor, reconfigure layout with 2 bathrooms & 2 bedrooms & living & dinning- exterior: remove stone veneerDetails
1st floor: 1)convert e offices into bedroom, add a bedroom, 2 bathrooms & kitchenette. 2)enclosed lightwell at right side of property, 3)relocate/upgrade elec. service to 200 amp. 4)2nd floor, reconfigure layout with 2 bathrooms & 2 bedrooms & living & dinning- exterior: remove stone veneer | $360,000 |
| Jan 15, 2025 | Completed final sign-off Dec 2025 | 651 Moscow St | 2nd/f: interior remodel of kitchen & 2 bathrooms. replace (e) fireplace with electric fireplace. ground/f: convert to living space 600 sf, included bedroom, office, bathroom, sink & mini kitchen.Details
2nd/f: interior remodel of kitchen & 2 bathrooms. replace (e) fireplace with electric fireplace. ground/f: convert to living space 600 sf, included bedroom, office, bathroom, sink & mini kitchen. | $80,000 |
| Jan 24, 2024 | Completed final sign-off Apr 2024 | 100 Dorado Tr | 2/f: kitchen remodel with wall removal.Details
2/f: kitchen remodel with wall removal. | $30,000 |