Back to kitchen remodel contractors
C & K Housing Const Co *Ck Id*
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Aug 2026
- Last 24 months
- 4 permits filed
130 permits since 2000: 101 completed, 3 in progress, 13 never finaled, 13 expired or cancelled.
Of the 13 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
53 kitchen remodel permits: 46 completed, 2 in progress, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2026 | Completed final sign-off May 2026 | 2551 29th Av | remodel kitchen in kind. no wall modification, no structural work.Details
remodel kitchen in kind. no wall modification, no structural work. | $20,000 |
| Jan 19, 2024 | Completed final sign-off Jan 2024 | 19 Salmon St | to comply w/nov# 202176581, replace kitchen exhaust fan.Details
to comply w/nov# 202176581, replace kitchen exhaust fan. | $1,000 |
| Jan 12, 2024 | In progress issued Jan 2024 | 738 43rd Av | revision to approved pa# 202307172308: relocated bathroom and kitchenette.Details
revision to approved pa# 202307172308: relocated bathroom and kitchenette. | |
| Oct 20, 2023 | In progress issued Oct 2023 | 440 10th Av | kitchen remodelingDetails
kitchen remodeling | $8,000 |
| Jul 17, 2023 | Never finaled issued Aug 2023, no final | 738 43rd Av | 1/f: construct (2) bedrooms, laundry, bathroom, kitchenette (2 burner, no oven).Details
1/f: construct (2) bedrooms, laundry, bathroom, kitchenette (2 burner, no oven). | $54,000 |
| Apr 11, 2022 | Completed final sign-off Aug 2022 | 1267 Pacific Av | apt 3: remodel (e) 1 kitchen & 1 bathroom. new fixtures. work in-kind, no layout changes or wall modifications. no structural work. no framing modifications.Details
apt 3: remodel (e) 1 kitchen & 1 bathroom. new fixtures. work in-kind, no layout changes or wall modifications. no structural work. no framing modifications. | $30,000 |
| Mar 11, 2022 | Expired or cancelled expired Nov 2024 | 1622 10th Av | comply with nov 202185673 and 202287504. 1)install family room, bedroom, and bathroom at 1st floor. 2) remodeling extg kitchen, change extg windows at lightwell to casement windows at 2nd floor only. 3)change front windows to double glass windows fiberglasframe at windows at 2nd floor and 3rd floor.Details
comply with nov 202185673 and 202287504. 1)install family room, bedroom, and bathroom at 1st floor. 2) remodeling extg kitchen, change extg windows at lightwell to casement windows at 2nd floor only. 3)change front windows to double glass windows fiberglasframe at windows at 2nd floor and 3rd floor. | $50,000 |
| Feb 7, 2022 | Completed final sign-off Jul 2022 | 157 07th Av | remodel kitchen and 1 1/2 bathroom. painting.Details
remodel kitchen and 1 1/2 bathroom. painting. | $35,000 |
| Feb 7, 2022 | Completed final sign-off Jul 2022 | 184 07th Av | remodel kitchen and 1 1/2 bathroom. rewire electrical painting. replace 4 windows at kitchen. non street facing.Details
remodel kitchen and 1 1/2 bathroom. rewire electrical painting. replace 4 windows at kitchen. non street facing. | $48,000 |
| Sep 16, 2021 | Expired or cancelled expired Apr 2026 | 50 Hazelwood Av | construct 2 bedroom, 2 full bath, & media room at ground floor. remodel (e) kitchen & 2 full bathroom on 2nd floor.Details
construct 2 bedroom, 2 full bath, & media room at ground floor. remodel (e) kitchen & 2 full bathroom on 2nd floor. | $138,000 |
| Jul 20, 2021 | Completed final sign-off Mar 2022 | 3919 Pacheco St | remodel kitchen and bath, remove walls on 2nd floor. infill below bedroom, add a full bath on 1st floor. replace deck at rear. replace water heater, furnace. upgrade electrical and plumbing system. add kitchenett on 1/fDetails
remodel kitchen and bath, remove walls on 2nd floor. infill below bedroom, add a full bath on 1st floor. replace deck at rear. replace water heater, furnace. upgrade electrical and plumbing system. add kitchenett on 1/f | $100,000 |
| Jul 15, 2021 | Completed final sign-off Oct 2021 | 122 Ordway St | remodel kitchen and bathroom. rewiring electrical, painting. refinish hardwood flooling. replace four window at back of house.Details
remodel kitchen and bathroom. rewiring electrical, painting. refinish hardwood flooling. replace four window at back of house. | $53,000 |
| May 26, 2021 | Completed final sign-off Apr 2022 | 431 San Miguel St | to comply with nov 202177076. 2nd fl only. add a new bath rm. relocated (e) kitchen to dining room. change (e) kitchen to home office. renew all electrical. remove (e) stairs. repair front dry rot about 45 sqftDetails
to comply with nov 202177076. 2nd fl only. add a new bath rm. relocated (e) kitchen to dining room. change (e) kitchen to home office. renew all electrical. remove (e) stairs. repair front dry rot about 45 sqft | $45,000 |
| May 20, 2021 | Completed final sign-off Jan 2022 | 3719 Alemany Bl | 1st floor; convert storage into living space. add 2 bedrooms, 1 full bath & media. 2nd fl: remodel kitchen & bath. add office & 1 full bath. add new deck at rear.Details
1st floor; convert storage into living space. add 2 bedrooms, 1 full bath & media. 2nd fl: remodel kitchen & bath. add office & 1 full bath. add new deck at rear. | $80,000 |
| Mar 15, 2021 | Completed final sign-off Jul 2021 | 1377 17th Av | remodel kitchen.Details
remodel kitchen. | $12,000 |
| Sep 25, 2020 | Never finaled issued Jun 2021, no final | 2638 39th Av | add2 bedrooms, 2 bath, 1 media room on ground floor. relocate kitchen, add 1 bath on 2nd floor. add new deck at rear of house less than 10' high.Details
add2 bedrooms, 2 bath, 1 media room on ground floor. relocate kitchen, add 1 bath on 2nd floor. add new deck at rear of house less than 10' high. | $68,888 |
| Nov 12, 2019 | Completed final sign-off Apr 2021 | 2136 Alemany Bl | to legalize the dwelling unit w/ 2 bedrooms, 1 bath and 1 kitchen at 1st flr to comply w/ ord# 43-14.Details
to legalize the dwelling unit w/ 2 bedrooms, 1 bath and 1 kitchen at 1st flr to comply w/ ord# 43-14. | $45,000 |
| Sep 27, 2019 | Completed final sign-off Jun 2020 | 83 Ledyard St | rev pa# 201807194977; comply with complaint #201951711, 1st fl reconfigure layout per plan, 2nd fl. remodel kitchen & bath room, convert half bath to full bathDetails
rev pa# 201807194977; comply with complaint #201951711, 1st fl reconfigure layout per plan, 2nd fl. remodel kitchen & bath room, convert half bath to full bath | $36,500 |
| Dec 21, 2018 | Completed final sign-off Nov 2020 | 1318 18th Av | remodeling (e) 2nd fl kitchen, bath room, provide additional 2- baths, convert (e) dining rm to bed rm. front buildingDetails
remodeling (e) 2nd fl kitchen, bath room, provide additional 2- baths, convert (e) dining rm to bed rm. front building | $55,000 |
| Dec 14, 2018 | Completed final sign-off Sep 2019 | 651 Geneva Av | add 2 bedrooms, media room, and 2 bathrooms on ground floor. relocate kitchen on 2nd floor.Details
add 2 bedrooms, media room, and 2 bathrooms on ground floor. relocate kitchen on 2nd floor. | $40,000 |
| Sep 13, 2018 | Completed final sign-off Jan 2026 | 1763 37th Av | proposed alteration and horizontal addition at rear bldg. 2nd flr add a master bedroom & bathroom @ rear. 1st flr add a new unit with 1 bedroom, 1 bathroom and kitchen/living room.Details
proposed alteration and horizontal addition at rear bldg. 2nd flr add a master bedroom & bathroom @ rear. 1st flr add a new unit with 1 bedroom, 1 bathroom and kitchen/living room. | $180,000 |
| Aug 21, 2018 | Completed final sign-off Mar 2019 | 43 Athens St | remodel (e) kitchen bathrm, add 1 new bathrm & convert (e) living rm to bedrm; 2nd fl - upgrade (e) family rm, construct 1 bedrm & full bathrm @ ground floor; construct new deck with staircase at rear of bldg (size approx 8'x8')Details
remodel (e) kitchen bathrm, add 1 new bathrm & convert (e) living rm to bedrm; 2nd fl - upgrade (e) family rm, construct 1 bedrm & full bathrm @ ground floor; construct new deck with staircase at rear of bldg (size approx 8'x8') | $72,000 |
| Sep 13, 2017 | Completed final sign-off Jun 2018 | 1833 Kirkham St | 2/f: remove dryrot balcony, remodel (e) kitchen & bathroom, add 1 new bathroom, enclosed (e) light court, add skylight. 1/f: new bedroom, bathroom & family room, relocate interior stairs, replace interior lath/plaster wall & ceiling with gyp. bd. (n) insulation.Details
2/f: remove dryrot balcony, remodel (e) kitchen & bathroom, add 1 new bathroom, enclosed (e) light court, add skylight. 1/f: new bedroom, bathroom & family room, relocate interior stairs, replace interior lath/plaster wall & ceiling with gyp. bd. (n) insulation. | $160,000 |
| Aug 1, 2017 | Completed final sign-off Aug 2022 | 1939 Ocean Av | tenant improvement for extg limited restaurant for health dept. change of ownership, update accessibility, restroom and counter. refurbish/remove/relocate and or replace kitchen equipments.Details
tenant improvement for extg limited restaurant for health dept. change of ownership, update accessibility, restroom and counter. refurbish/remove/relocate and or replace kitchen equipments. | $12,000 |
| Jul 17, 2017 | Completed final sign-off Aug 2017 | 571 26th Av | remodel kitchen, change cabinets, counter top, no change on walls.Details
remodel kitchen, change cabinets, counter top, no change on walls. | $6,800 |
| May 2, 2017 | Completed final sign-off Oct 2017 | 2530 16th Av | rearrange/remodel bedrooms, bath, kitchen and stairs, add bath on 2nd floor. add bedrooms, family, storage, full bath 1st fl. replace relocate windows doors. relocate water heater, furnace. upgrade elec plumb. excavate area on 1st fl and replace footing. 20ydDetails
rearrange/remodel bedrooms, bath, kitchen and stairs, add bath on 2nd floor. add bedrooms, family, storage, full bath 1st fl. replace relocate windows doors. relocate water heater, furnace. upgrade elec plumb. excavate area on 1st fl and replace footing. 20yd | $90,000 |
| Mar 24, 2017 | Completed final sign-off Aug 2018 | 2339 California St | to comply with nov 201763041 remodel of kitchen in unit 12Details
to comply with nov 201763041 remodel of kitchen in unit 12 | $15,000 |
| Aug 2, 2016 | Completed final sign-off Aug 2016 | 706 46th Av | comply with notice of violation complaint # 201622774. replace (4) windows in the rear bedroom. patch hole in the wall, repair sink in the kitchen, repair bath toilet. install electrical outlet in the laundry area.Details
comply with notice of violation complaint # 201622774. replace (4) windows in the rear bedroom. patch hole in the wall, repair sink in the kitchen, repair bath toilet. install electrical outlet in the laundry area. | $1,000 |
| Jul 15, 2016 | Completed final sign-off Dec 2016 | 30 Encanto Av | remodel 2/f 1 kitchen and 2 full bathrooms. replace exh fans inkind. replace fireplace at 2/f with gas, direct vent. instlal per mfg install reqs. replace dry rot siding wood at s/s wall about 300sf. all new lighting shall be led, r-13 wall insulation.Details
remodel 2/f 1 kitchen and 2 full bathrooms. replace exh fans inkind. replace fireplace at 2/f with gas, direct vent. instlal per mfg install reqs. replace dry rot siding wood at s/s wall about 300sf. all new lighting shall be led, r-13 wall insulation. | $53,000 |
| Jun 3, 2016 | Completed final sign-off Aug 2016 | 2433 Larkin St | #5- remodel kitchen, everything remaining in same location.Details
#5- remodel kitchen, everything remaining in same location. | $9,800 |
| May 12, 2016 | Completed final sign-off Aug 2017 | 507 Divisadero St | remodeling extg unit "a" at 2nd floor. remodeling kitchen, add 1 bath room, change extg bedroom to 2 bedroom. new furnace.Details
remodeling extg unit "a" at 2nd floor. remodeling kitchen, add 1 bath room, change extg bedroom to 2 bedroom. new furnace. | $35,000 |
| Mar 16, 2016 | Completed final sign-off Aug 2016 | 718 39th Av | remodel kitchen, baths and bedroom on 2nd floor create hallway to studyDetails
remodel kitchen, baths and bedroom on 2nd floor create hallway to study | $20,000 |
| Aug 7, 2015 | Completed final sign-off Oct 2016 | 460 Monticello St | 1st flr alteration to add 3 bedrooms, family room, 2 full baths & laundry room. remodel kitchen & bathroom, add a new bathroom on 2nd flr. install 11 windows, retrofit 2 windows.Details
1st flr alteration to add 3 bedrooms, family room, 2 full baths & laundry room. remodel kitchen & bathroom, add a new bathroom on 2nd flr. install 11 windows, retrofit 2 windows. | $120,000 |
| Jan 24, 2008 | Completed final sign-off Jul 2008 | 287 Teddy Av | remodel kitchen and bath, no wall changesDetails
remodel kitchen and bath, no wall changes | $14,000 |
| Jan 11, 2008 | Completed final sign-off May 2008 | 2807 Bryant St | remodeled (e) kitchen in both units. kitchen location remains same. also, remodeled bathrooms in both units.Details
remodeled (e) kitchen in both units. kitchen location remains same. also, remodeled bathrooms in both units. | $7,000 |
| Nov 16, 2007 | Completed final sign-off Aug 2008 | 567 Silver Av | interior remodel to provide at ground floor new bedroom,bathroom,laundry,and play room, 2nd floor-remodel kitchen,relocate bathroomrepair termite damge on 2 floorsDetails
interior remodel to provide at ground floor new bedroom,bathroom,laundry,and play room, 2nd floor-remodel kitchen,relocate bathroomrepair termite damge on 2 floors | $45,000 |
| Oct 23, 2007 | Completed final sign-off Jan 2008 | 656 Girard St | alteration to existing 2nd floor to respond compliant #200726566. 1. to add one new half bath room on (e) walk-in-closet area. 2. convert (e) dining room to new computer room use. 3. remodel (e) bathroom and kitchen per 2nd floor plan. all work performed on 2nd floor.Details
alteration to existing 2nd floor to respond compliant #200726566. 1. to add one new half bath room on (e) walk-in-closet area. 2. convert (e) dining room to new computer room use. 3. remodel (e) bathroom and kitchen per 2nd floor plan. all work performed on 2nd floor. | $18,000 |
| Oct 3, 2007 | Completed final sign-off Jun 2008 | 1451 29th Av | interior remodel of kitchen & bathrooms. upstairs will have 3 baths, 2 bedrooms with office. downstairs will have 2 new bedroom, 2 bath. add new beams @ 2/f kitchen, infilling lightwell 2 total. remove one (e) post @ garage, add nine new post & foundation.Details
interior remodel of kitchen & bathrooms. upstairs will have 3 baths, 2 bedrooms with office. downstairs will have 2 new bedroom, 2 bath. add new beams @ 2/f kitchen, infilling lightwell 2 total. remove one (e) post @ garage, add nine new post & foundation. | $99,000 |
| Sep 11, 2007 | Completed final sign-off Dec 2007 | 728 Pacific Av | work @ unit# 201. soft demo. of 2nd flr. restaurant, including dining, kitchen & service area. remove (e) non-strl. walls, suspended ceiling, furred walls & columns, equip, fixtures, light & plumb fixtures, hvav, carpet, floor tiles, etc. except: exit stair shaft & enclosures, emergency exit lights,Details
work @ unit# 201. soft demo. of 2nd flr. restaurant, including dining, kitchen & service area. remove (e) non-strl. walls, suspended ceiling, furred walls & columns, equip, fixtures, light & plumb fixtures, hvav, carpet, floor tiles, etc. except: exit stair shaft & enclosures, emergency exit lights, | $25,000 |
| Jul 13, 2007 | Completed final sign-off Sep 2007 | 1477 09th Av | comply w/ nov 200710232 dated 7/03/07, g/f, remodel illegal kitchen & wall heater, remodel bath to 1/2 bath, 2nd fl remodel bathrms. repari rear stairs per his complain #200709932Details
comply w/ nov 200710232 dated 7/03/07, g/f, remodel illegal kitchen & wall heater, remodel bath to 1/2 bath, 2nd fl remodel bathrms. repari rear stairs per his complain #200709932 | $20,000 |
| Jul 9, 2007 | Completed final sign-off Dec 2024 | 314 04th Av | interior remodel with new rear exterior deck. new bathrooms & kitchen remodels @ both units. front stair repair & windows to be replaced in kind.Details
interior remodel with new rear exterior deck. new bathrooms & kitchen remodels @ both units. front stair repair & windows to be replaced in kind. | $120,000 |
| Jun 1, 2007 | Completed final sign-off Sep 2007 | 2585 25th Av | interior remodel. new bathroom & bedroom downstairs. bath & kitchen remodel upstairs.Details
interior remodel. new bathroom & bedroom downstairs. bath & kitchen remodel upstairs. | $40,000 |
| Mar 7, 2007 | Completed final sign-off May 2007 | 1750 Broadway | unit#1 only.remove (1) bathroom and remove (1) kitchen. (no structural) + new lighting. lighting to comply w/ t-24 enery codes. to comply w/his nov#200337840 date 02/19/03.Details
unit#1 only.remove (1) bathroom and remove (1) kitchen. (no structural) + new lighting. lighting to comply w/ t-24 enery codes. to comply w/his nov#200337840 date 02/19/03. | $8,000 |
| Dec 27, 2006 | Completed final sign-off Apr 2007 | 2282 29th Av | interior remodel 1st & 2nd flr. upstairs-bathroom(2) remodel, kitchen remodel.downstairs(n) bedroom &(n)bathroom.structural work incl new beams and plywood walls also repair plaster where req.remove &close ctr lite well &side property line lite well.remove structural wall on 2/fl.Details
interior remodel 1st & 2nd flr. upstairs-bathroom(2) remodel, kitchen remodel.downstairs(n) bedroom &(n)bathroom.structural work incl new beams and plywood walls also repair plaster where req.remove &close ctr lite well &side property line lite well.remove structural wall on 2/fl. | $50,000 |
| Oct 23, 2006 | Completed final sign-off Jun 2007 | 9 Lyell St | comply with nov #200677199 adding one new full bath at 2/f. remodeling existing kitchen & bathroom at 2/f as per planDetails
comply with nov #200677199 adding one new full bath at 2/f. remodeling existing kitchen & bathroom at 2/f as per plan | $20,000 |
| Sep 22, 2006 | Completed final sign-off Feb 2007 | 1610 39th Av | remodel kitchen. 50% high effic lighting.Details
remodel kitchen. 50% high effic lighting. | $15,000 |
| Sep 6, 2006 | Completed final sign-off Jul 2007 | 789 Panorama Dr | convert (e) storage room ground floor to new family room, add half bath & remodel (e) laundry room. extend new 10'x25' deck 2nd floor, remodel kitchen.Details
convert (e) storage room ground floor to new family room, add half bath & remodel (e) laundry room. extend new 10'x25' deck 2nd floor, remodel kitchen. | $45,000 |
| Aug 22, 2006 | Expired or cancelled expired Dec 2007 | 3217 Santiago St | to address complaint 200565201-bid. remove partition wall adding (n) bem as per plan, between 2nd floor living room & kitchen.Details
to address complaint 200565201-bid. remove partition wall adding (n) bem as per plan, between 2nd floor living room & kitchen. | $10,000 |
| Jul 12, 2006 | Completed final sign-off Dec 2006 | 2078 Revere Av | to partition ground floor, 1 bedroom, family room/laundry and full bathroom. remodel 2/f bathroom & kitchen, repair front facade dry rot, re-stucco.Details
to partition ground floor, 1 bedroom, family room/laundry and full bathroom. remodel 2/f bathroom & kitchen, repair front facade dry rot, re-stucco. | $50,000 |
| Feb 9, 2006 | Completed final sign-off Mar 2006 | 1214 Polk St | add new outlets, add 220v outlet & plumbing piping, refre. at kitchen counter area.Details
add new outlets, add 220v outlet & plumbing piping, refre. at kitchen counter area. | $7,500 |
| Nov 15, 2005 | Completed final sign-off Jan 2006 | 591 38th Av | remodeling kitchen. change new heater (14x12) in kitchen. replace dining room & living room sheetrock. same size vinyl windows (10 windows)Details
remodeling kitchen. change new heater (14x12) in kitchen. replace dining room & living room sheetrock. same size vinyl windows (10 windows) | $15,000 |
| Oct 19, 2005 | Completed final sign-off Jan 2006 | 591 38th Av | remodeling kitchen. change kitchen cabinets. tile paint. repaair bathroom. shedrock. change (3) windows. kitchen room. not visble fromt street. no structural work.Details
remodeling kitchen. change kitchen cabinets. tile paint. repaair bathroom. shedrock. change (3) windows. kitchen room. not visble fromt street. no structural work. | $25,000 |
| Oct 4, 2005 | Completed final sign-off Dec 2005 | 2 Parkridge Dr | remodel kitchen,bathroom,living room, 2 windows & paint.no structural work,provide fluorescent light fixtures.Details
remodel kitchen,bathroom,living room, 2 windows & paint.no structural work,provide fluorescent light fixtures. | $18,000 |