Back to bathroom remodel contractors
C H Burnham Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Aug 2026
- Last 24 months
- 15 permits filed
148 permits since 2000: 120 completed, 10 in progress, 11 never finaled, 7 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 9 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
55 bathroom remodel permits: 44 completed, 6 in progress, 1 never finaled, 4 expired or cancelled. Typically 22 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Sep 2026 | 1480 Willard St | remodel 1/f plan. in-fill addition at balcony. rebuild stairs to the 2/f to bring them into code compliance. add new bath & bar. new rear windows.Details
remodel 1/f plan. in-fill addition at balcony. rebuild stairs to the 2/f to bring them into code compliance. add new bath & bar. new rear windows. | $150,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 1480 Willard St | remodel basement in single family home. add new bath & sauna. new glass doors & window.Details
remodel basement in single family home. add new bath & sauna. new glass doors & window. | $150,000 |
| May 6, 2026 | In progress issued May 2026 | 511 10th Av | revision to permit 202407025677. remove one skylight & one bathroom from third floor. relocate mudroom and laundry on ground floor. relocate water heater and hvac to garage. revise kitchen layout on second floor and remove west-facing kitchen window. revise window configuration at bedroom 3.Details
revision to permit 202407025677. remove one skylight & one bathroom from third floor. relocate mudroom and laundry on ground floor. relocate water heater and hvac to garage. revise kitchen layout on second floor and remove west-facing kitchen window. revise window configuration at bedroom 3. | $60,000 |
| Apr 29, 2026 | In progress issued Jun 2026 | 3880 Cesar Chavez St | revision to permit 202108045703, remove full bathroom from 1st floor proposed scope, convert to storage room with future bathroom rough-in plumbing.Details
revision to permit 202108045703, remove full bathroom from 1st floor proposed scope, convert to storage room with future bathroom rough-in plumbing. | |
| Jun 26, 2025 | Completed final sign-off Aug 2026 | 1225 17th Av | remodel new kitchenette & new window at 1st fl. remodel of kitchen & bathroom at 2nd fl. lighting & electrical upgrades. new boiler for radiant heat att 1st & 2nd fl. no new square footage, no horizontal or vertical additionDetails
remodel new kitchenette & new window at 1st fl. remodel of kitchen & bathroom at 2nd fl. lighting & electrical upgrades. new boiler for radiant heat att 1st & 2nd fl. no new square footage, no horizontal or vertical addition | $350,000 |
| May 6, 2025 | Expired or cancelled cancelled Jan 2026 | 345 Santa Clara Av | basement: convert portion to living space w/ bath, laundry, and storage. rebuild interior stair to basement. level 1: renovation of rear living space and kitchen, (n) powder room. level 2: full renovation of (e) bathrooms. replacement windows and some (n) windows. reduce size of garage.Details
basement: convert portion to living space w/ bath, laundry, and storage. rebuild interior stair to basement. level 1: renovation of rear living space and kitchen, (n) powder room. level 2: full renovation of (e) bathrooms. replacement windows and some (n) windows. reduce size of garage. | |
| Nov 4, 2024 | In progress issued Dec 2025 | 511 10th Av | remove non historic exterior cladding; infill under (e) elevated 2 story wing facing rear yard; replace 7 exterior windows; replace windows w/(n) clad windows; 1st fl excavation increase ceiling ht; construct (n) bedrm & (n) bath; 2nd fl - kitchen remodel & (n) powder rm; 3rd fl - remodel 2 (e) bathDetails
remove non historic exterior cladding; infill under (e) elevated 2 story wing facing rear yard; replace 7 exterior windows; replace windows w/(n) clad windows; 1st fl excavation increase ceiling ht; construct (n) bedrm & (n) bath; 2nd fl - kitchen remodel & (n) powder rm; 3rd fl - remodel 2 (e) bath | $400,000 |
| Aug 23, 2024 | Expired or cancelled expired Dec 2025 | 39 Atalaya Tr | rev 202405021269- lower florr in garage work room and adjacent hall to match (n) laundry and bath 3Details
rev 202405021269- lower florr in garage work room and adjacent hall to match (n) laundry and bath 3 | $5,000 |
| May 2, 2024 | Completed final sign-off Dec 2025 | 39 Atalaya Tr | remodel kitchen, pantry and powder at 2nd floor. convert a portion of ground floor unconditional space into conditioned area with new bath, laundry room & connecting stair. remodel 3rd floor baths. new windows at sides and rear. no change to front elevation.Details
remodel kitchen, pantry and powder at 2nd floor. convert a portion of ground floor unconditional space into conditioned area with new bath, laundry room & connecting stair. remodel 3rd floor baths. new windows at sides and rear. no change to front elevation. | $200,000 |
| Apr 8, 2024 | Completed final sign-off Aug 2024 | 2224 Ortega St | bathroom remodel: move no walls.Details
bathroom remodel: move no walls. | $40,000 |
| Oct 13, 2023 | Completed final sign-off Oct 2024 | 125 Villa Tr | remodel primary bathroom @ level 3; replace 5 doors facing rear yard. no structural workDetails
remodel primary bathroom @ level 3; replace 5 doors facing rear yard. no structural work | $20,000 |
| Oct 10, 2023 | In progress issued May 2024 | 3880 Cesar Chavez St | revision to pa# 202108045703. revise primary bath layout. reduce rear yard deck (no fire wall), remove deck stairs, reduce landscape patio at rear. revise kitchen layout. revise 1st fl bathroom layout. revise location of rear-facing windows. no work visible from st.Details
revision to pa# 202108045703. revise primary bath layout. reduce rear yard deck (no fire wall), remove deck stairs, reduce landscape patio at rear. revise kitchen layout. revise 1st fl bathroom layout. revise location of rear-facing windows. no work visible from st. | |
| Jul 12, 2023 | Completed final sign-off Aug 2024 | 844 Page St | rear bldg/ revision to 202206297404: 1st fl-construct new laundry room, remove powder rm, modify 1st fl bedroom from original. 2nd fl: modify bathroom from originalDetails
rear bldg/ revision to 202206297404: 1st fl-construct new laundry room, remove powder rm, modify 1st fl bedroom from original. 2nd fl: modify bathroom from original | |
| Jan 5, 2023 | Completed final sign-off Aug 2023 | 111 Noe St | unit a: remodel bathroom, kitchen, and bedroom closet. replace 8 windows in rear and exterior rear door. repair dry rot at ceiling membrane under (e) roof deck less than 50%Details
unit a: remodel bathroom, kitchen, and bedroom closet. replace 8 windows in rear and exterior rear door. repair dry rot at ceiling membrane under (e) roof deck less than 50% | $20,000 |
| Dec 21, 2022 | Completed final sign-off Jun 2023 | 184 Aptos Av | 3/flr: remodel 2 bathrooms, add laundry closet. replace 9 metal windows with wood windows, replace gravity furnace w/ new electric heat pump hvac. replace knob and tube electrical throughout.Details
3/flr: remodel 2 bathrooms, add laundry closet. replace 9 metal windows with wood windows, replace gravity furnace w/ new electric heat pump hvac. replace knob and tube electrical throughout. | $250,000 |
| Nov 14, 2022 | Completed final sign-off Apr 2023 | 760 Church St | partial bathroom remodel in kind and shower panDetails
partial bathroom remodel in kind and shower pan | $5,000 |
| Feb 28, 2022 | Completed final sign-off Apr 2023 | 760 Church St | unit#1: in kind, remodel bathroom and kitchen. move no walls- in kind. replace siding on south side of unit #1 in kind.Details
unit#1: in kind, remodel bathroom and kitchen. move no walls- in kind. replace siding on south side of unit #1 in kind. | $30,000 |
| Feb 15, 2022 | Completed final sign-off Dec 2025 | 25 Bennington St | remove 1-story rear addition & replace w/ 3-story addition. excavate @ rear garage to create 1st fl living space. relocate (e) 2nd fl kitchen & bathroom, add 2 dommers, 2 bedrooms, 1 bath, skylight, & balcony @ 3rd fl. build ((n) interior stair. add spiral stair & patio @ rearDetails
remove 1-story rear addition & replace w/ 3-story addition. excavate @ rear garage to create 1st fl living space. relocate (e) 2nd fl kitchen & bathroom, add 2 dommers, 2 bedrooms, 1 bath, skylight, & balcony @ 3rd fl. build ((n) interior stair. add spiral stair & patio @ rear | $550,000 |
| Sep 30, 2021 | Completed final sign-off Jan 2023 | 1258 43rd Av | revision to 202008262715, clouded at delta 4 arch, delta 2 structural. new lightwell with 2 new dual glazed windows, layout changes to new master bath, new bath 1, and new bath 2.Details
revision to 202008262715, clouded at delta 4 arch, delta 2 structural. new lightwell with 2 new dual glazed windows, layout changes to new master bath, new bath 1, and new bath 2. | $1,000 |
| Sep 10, 2021 | Completed final sign-off Jun 2024 | 483 28th St | remodel e (2) kitchens and (2) baths. remove load bearing wall. add (2) washers and (2) dryers.Details
remodel e (2) kitchens and (2) baths. remove load bearing wall. add (2) washers and (2) dryers. | $95,000 |
| Aug 17, 2021 | Completed final sign-off Mar 2022 | 111 Noe St | kitchen and bath remodel in kind.lights per cec 150.0k.Details
kitchen and bath remodel in kind.lights per cec 150.0k. | $30,000 |
| Jul 30, 2021 | Completed final sign-off Mar 2023 | 5333 California St | interior remodel of 1st fl unit 5333 to include relocated kitchen, master bath, bathroomDetails
interior remodel of 1st fl unit 5333 to include relocated kitchen, master bath, bathroom | $115,000 |
| Feb 4, 2021 | Completed final sign-off Feb 2023 | 760 Church St | remodel kitchen, wall to be removed between living room and dining room. new bedroom. new bathroom at master bedroom.Details
remodel kitchen, wall to be removed between living room and dining room. new bedroom. new bathroom at master bedroom. | $135,000 |
| Aug 26, 2020 | Completed final sign-off Jan 2023 | 1258 43rd Av | remodel includes a (n) master suite (m. bed, bath, closet), (n) office, (n) storage area and (n) laundry at lower level. at main level, remodel includes 2 (n) bathrooms, and renovated kitchen / dining area.Details
remodel includes a (n) master suite (m. bed, bath, closet), (n) office, (n) storage area and (n) laundry at lower level. at main level, remodel includes 2 (n) bathrooms, and renovated kitchen / dining area. | $380,000 |
| Aug 22, 2020 | Completed final sign-off Jun 2023 | 11 Surrey St | interior remodel of (e) 2-story residence with 267 unconditioned crawl space; remodel bath, add skylight, (n) window, family rm, remodel living rm/kitchen/breakfast rm. move doors in 2 bedrooms. convert crawl space into conditioned space w/ laundry/bath/mech room. new deck/stairs and wall.Details
interior remodel of (e) 2-story residence with 267 unconditioned crawl space; remodel bath, add skylight, (n) window, family rm, remodel living rm/kitchen/breakfast rm. move doors in 2 bedrooms. convert crawl space into conditioned space w/ laundry/bath/mech room. new deck/stairs and wall. | $100,000 |
| Dec 17, 2019 | Completed final sign-off Mar 2022 | 21 Paramount Tr | reconfiguration of interior walls & exterior entry, 1 new bath, 2 new bedroom, 1 new interior communication stair, and 2 new rear windows, 2 new skylights, replacement of 1 existing skylight. remodel existing kitchen and bathDetails
reconfiguration of interior walls & exterior entry, 1 new bath, 2 new bedroom, 1 new interior communication stair, and 2 new rear windows, 2 new skylights, replacement of 1 existing skylight. remodel existing kitchen and bath | $325,000 |
| Jul 5, 2019 | Completed final sign-off Dec 2020 | 844 Cabrillo St | renovation to (e) 1/f including (n) master bedrm, (n) closet, (n) bath; modification to (e) interior stairs; window/door changes at rear on 1/f; replacement of 2/f fireplace; minor interior modification at 2/f; 2 lightwell to be replaced in kind; cosmetic upgrades to (e) common hallDetails
renovation to (e) 1/f including (n) master bedrm, (n) closet, (n) bath; modification to (e) interior stairs; window/door changes at rear on 1/f; replacement of 2/f fireplace; minor interior modification at 2/f; 2 lightwell to be replaced in kind; cosmetic upgrades to (e) common hall | $100,000 |
| Dec 13, 2018 | Completed final sign-off May 2019 | 49 Seacliff Av | remodel three bathrooms no change to existing layout. remodel in kind, no structural work. comply with cec 152(k)5Details
remodel three bathrooms no change to existing layout. remodel in kind, no structural work. comply with cec 152(k)5 | $50,000 |
| Aug 7, 2018 | Completed final sign-off Nov 2018 | 1895 Pacific Av | remodel bathroom - move no wallsDetails
remodel bathroom - move no walls | $15,000 |
| May 14, 2018 | Completed final sign-off Oct 2018 | 950 Columbus Av | remodel two bathrooms no walls will be moved, replace 1(x) tub, 1(x) shower surround, 2(x) vanitiesDetails
remodel two bathrooms no walls will be moved, replace 1(x) tub, 1(x) shower surround, 2(x) vanities | $30,000 |
| Mar 8, 2018 | Completed final sign-off Oct 2018 | 1683 32nd Av | new pair of 32" french door at laoundry, bathroom remodel in kind, new 22'0" x 9'-0" rear patio, lower the closet ceiling by 3" at 2nd fl. replace front windows in kind (same size and location) with wood (casement)Details
new pair of 32" french door at laoundry, bathroom remodel in kind, new 22'0" x 9'-0" rear patio, lower the closet ceiling by 3" at 2nd fl. replace front windows in kind (same size and location) with wood (casement) | $5,000 |
| Jan 26, 2018 | Completed final sign-off Apr 2018 | 2729 Jackson St | bathroom remodel. no structural work. no wall/layout modifications.Details
bathroom remodel. no structural work. no wall/layout modifications. | $10,000 |
| Jan 16, 2018 | Completed final sign-off Apr 2018 | 369 Missouri St | bathroom remodel - no walls will be moved.Details
bathroom remodel - no walls will be moved. | $20,000 |
| Sep 19, 2017 | Completed final sign-off Nov 2017 | 1683 32nd Av | remodel bathroom - move no wallsDetails
remodel bathroom - move no walls | $15,000 |
| Jul 11, 2017 | Completed final sign-off Nov 2018 | 18 Roanoke St | revision to 201510018589 to omit 2nd fl renovations, add new interior stair to 1st fl, convert 1st fl to conditioned space with 2 bdrms and bath in addition to work under orig permitDetails
revision to 201510018589 to omit 2nd fl renovations, add new interior stair to 1st fl, convert 1st fl to conditioned space with 2 bdrms and bath in addition to work under orig permit | |
| May 3, 2017 | Completed final sign-off Dec 2017 | 3400 Clay St | interior alteration: remove raised floor in the lower level, new fixtures & fittings in the third level & fourth level bathroom, wet bar in the lower level.Details
interior alteration: remove raised floor in the lower level, new fixtures & fittings in the third level & fourth level bathroom, wet bar in the lower level. | $10,000 |
| Nov 22, 2016 | Completed final sign-off Jan 2018 | 2953 Broderick St | remodel extg ground floor powder room, laundry area and garden room to create theatre, guest bedroom and bathroom. no work visible from street.Details
remodel extg ground floor powder room, laundry area and garden room to create theatre, guest bedroom and bathroom. no work visible from street. | $30,000 |
| Aug 17, 2016 | Completed final sign-off Dec 2016 | 2774 Jackson St | remodel kitchen & bathroom. move no walls. n/a for maher.Details
remodel kitchen & bathroom. move no walls. n/a for maher. | $40,000 |
| Jul 18, 2016 | Completed final sign-off Feb 2017 | 17 25th North Av | remodel kitchen, change master bedroom layout and remodel shower in bathroom.Details
remodel kitchen, change master bedroom layout and remodel shower in bathroom. | $50,000 |
| Dec 18, 2015 | Completed final sign-off May 2017 | 2773 Clay St | remodel kitchen and three bathrooms, reconfigure ground floor and small modification to floor plan on 2nd floor. no work on front facade, no expansion of building foot print. interior demo less than 75%.Details
remodel kitchen and three bathrooms, reconfigure ground floor and small modification to floor plan on 2nd floor. no work on front facade, no expansion of building foot print. interior demo less than 75%. | $200,000 |
| Dec 16, 2015 | Completed final sign-off Jul 2016 | 678 39th Av | renovate bathroom & kitchen, open wall in kitchen, renovate deck, (n) door to deck, 1 hr. fire wall at property line, structural work.Details
renovate bathroom & kitchen, open wall in kitchen, renovate deck, (n) door to deck, 1 hr. fire wall at property line, structural work. | $36,000 |
| Dec 7, 2015 | Completed final sign-off Sep 2016 | 165 Farnum St | expand house on the gr fl towards rear. create new bath and laundry room gr fl. expand exiting entertainment room of gr flDetails
expand house on the gr fl towards rear. create new bath and laundry room gr fl. expand exiting entertainment room of gr fl | $97,000 |
| Oct 13, 2015 | Completed final sign-off May 2017 | 1001 Pine St | unit #1402: bathroom remodel, no structural work, all fixtures to remain in existing location5/8 type "x" sheetrockDetails
unit #1402: bathroom remodel, no structural work, all fixtures to remain in existing location5/8 type "x" sheetrock | $5,000 |
| Oct 1, 2015 | Completed final sign-off Nov 2018 | 18 Roanoke St | rear horizontal addition @ 1st & 3rd flrs to include expansion below 2nd flr roof deck & over 2nd flr rear roof, 1st flr to contain new bedrm & bath, 3rd flr to expand rear bedrm & add bath, widen (e) garage door; renovate & reconfigure 2nd flr kitchen & convert entry to porch.Details
rear horizontal addition @ 1st & 3rd flrs to include expansion below 2nd flr roof deck & over 2nd flr rear roof, 1st flr to contain new bedrm & bath, 3rd flr to expand rear bedrm & add bath, widen (e) garage door; renovate & reconfigure 2nd flr kitchen & convert entry to porch. | $150,000 |
| Jul 27, 2015 | Expired or cancelled cancelled Jun 2016 | 100 Parker Av | #301 - remodel bathroom & kitchen. remove wall between diving room & living room, remove partition wall between two closets in bedroom.Details
#301 - remodel bathroom & kitchen. remove wall between diving room & living room, remove partition wall between two closets in bedroom. | $50,000 |
| May 11, 2015 | Completed final sign-off Sep 2015 | 2003 Lyon St | remodel two bathrooms, move no wall.Details
remodel two bathrooms, move no wall. | $40,000 |
| Mar 30, 2015 | Never finaled issued Mar 2015, no final | 75 West Clay St | bathroom remodel: replace tile and valve in 2nd floor bathroom. no change to existing floor plan. compliance with maher odinance no 155-13 not required.Details
bathroom remodel: replace tile and valve in 2nd floor bathroom. no change to existing floor plan. compliance with maher odinance no 155-13 not required. | $3,000 |
| Nov 18, 2014 | Expired or cancelled cancelled Jan 2026 | 420 Hazelwood Av | remodel bathroomDetails
remodel bathroom | $20,000 |
| Nov 18, 2014 | Completed final sign-off Feb 2015 | 420 Hazelwood Av | bathroom remodelon second floorDetails
bathroom remodelon second floor | $20,000 |
| Oct 21, 2014 | Completed final sign-off Sep 2017 | 48 Westgate Dr | replace (e) foundation. renovate & expand habitable space on ground floor. add 3 bedrooms, 2 baths, family room and laundry. 3 new windows in front. 1 window in stairwell. replace staircase.Details
replace (e) foundation. renovate & expand habitable space on ground floor. add 3 bedrooms, 2 baths, family room and laundry. 3 new windows in front. 1 window in stairwell. replace staircase. | $203,575 |
| Sep 12, 2014 | Completed final sign-off Feb 2015 | 666 Post St | remodel 1 kitchen, replace cabinets, new countertop, remodel 1 bathroom replace in-kind, move no walls, no structural work.Details
remodel 1 kitchen, replace cabinets, new countertop, remodel 1 bathroom replace in-kind, move no walls, no structural work. | $48,000 |
| Jun 4, 2014 | Completed final sign-off Jan 2015 | 527 Central Av | interior remodel: kitchen, bath, and new spiral staircase to replace extg. remove powder room and convert to new full bath, add office at ground floor.Details
interior remodel: kitchen, bath, and new spiral staircase to replace extg. remove powder room and convert to new full bath, add office at ground floor. | $50,000 |
| Jan 17, 2014 | Completed final sign-off Feb 2014 | 1896 Pacific Av | bathroom remodel - replace tub, vanity & toilet in kind more no walls (no windows or doors intalled with this permit)Details
bathroom remodel - replace tub, vanity & toilet in kind more no walls (no windows or doors intalled with this permit) | $20,000 |
| Aug 17, 2012 | Completed final sign-off Jun 2013 | 1896 Pacific Av | 9th floor penthouse unit interior work consists of demoliton & relocation of the (e) kitchen & bathroom. the master bedroom wall is being demolished & a new laundry room, powder room & storage room. new interior stairs will be added to connect the bedrooms.Details
9th floor penthouse unit interior work consists of demoliton & relocation of the (e) kitchen & bathroom. the master bedroom wall is being demolished & a new laundry room, powder room & storage room. new interior stairs will be added to connect the bedrooms. | $350,000 |
| May 1, 2012 | Completed final sign-off Aug 2012 | 1363 Filbert St | removal of section of wall between kitchen & dining room. enlargement & upgrade of existing bathroom.Details
removal of section of wall between kitchen & dining room. enlargement & upgrade of existing bathroom. | $25,000 |