Back to kitchen remodel contractors
C D Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Dec 2016
- Last 24 months
- 0 permits filed
28 permits since 2000: 26 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 13 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2016 | Completed final sign-off Nov 2016 | 1346 39th Av | remodel kitchen & bathroom (no wall changes); appliances remaining in same location.Details
remodel kitchen & bathroom (no wall changes); appliances remaining in same location. | $8,500 |
| Apr 10, 2014 | Completed final sign-off Jan 2015 | 268 06th Av | unit 301: repair one (1) kitchen, replace courtertops, six (6) cabinets, change two (2) bathroomtoilets, sinks, shower pan, wall tiles.Details
unit 301: repair one (1) kitchen, replace courtertops, six (6) cabinets, change two (2) bathroomtoilets, sinks, shower pan, wall tiles. | $8,000 |
| Jan 7, 2013 | Completed final sign-off May 2013 | 1335 Washington St | unit #2:replace kitchen cabinets, counter top and vynil floor. replace bathroom tub, sink, wall tiles.Details
unit #2:replace kitchen cabinets, counter top and vynil floor. replace bathroom tub, sink, wall tiles. | $14,000 |
| Aug 10, 2012 | Completed final sign-off Dec 2012 | 697 44th Av | repair kitchen-replace cabinets, counter tops in kind at the same location. repair shower in bathroom, no change to wall or exterior. no structural workDetails
repair kitchen-replace cabinets, counter tops in kind at the same location. repair shower in bathroom, no change to wall or exterior. no structural work | $9,200 |
| Jul 5, 2011 | Completed final sign-off Aug 2011 | 695 44th Av | repair (1) kitchen - replace cabinet and countertop and new kitchen sink. no change to wall or exterior. change in kind. window in kitchen max u-factor .40. lighting to comply with cec 150(k)Details
repair (1) kitchen - replace cabinet and countertop and new kitchen sink. no change to wall or exterior. change in kind. window in kitchen max u-factor .40. lighting to comply with cec 150(k) | $6,800 |
| Jul 5, 2011 | Expired or cancelled cancelled Jan 2026 | 695 44th Av | repair (1) kitchen - replace cabinet and countertop and new kitchen sink. no change to wall or exterior. change in kind. window in kitchen max u-factor .40. lighting to comply with cec 150(k)Details
repair (1) kitchen - replace cabinet and countertop and new kitchen sink. no change to wall or exterior. change in kind. window in kitchen max u-factor .40. lighting to comply with cec 150(k) | |
| Apr 29, 2011 | Completed final sign-off Jul 2011 | 1630 Jones St | #2- replace 1 kitchen cabinets, counter and sink, no new lighting, no flooring and remodel of small 8' counter area. replace 1 bathroom tiles only, no other changes.Details
#2- replace 1 kitchen cabinets, counter and sink, no new lighting, no flooring and remodel of small 8' counter area. replace 1 bathroom tiles only, no other changes. | $6,500 |
| Nov 10, 2010 | Completed final sign-off Jan 2011 | 1846 Larkin St | #6- replace kitchen cabinets, counter and sink. patch holes and paint in apartment #6 only. replace (7) windows, same size and location. all work in apartment 6 only. non structural workDetails
#6- replace kitchen cabinets, counter and sink. patch holes and paint in apartment #6 only. replace (7) windows, same size and location. all work in apartment 6 only. non structural work | $8,000 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 514 22nd Av | relocate existing kitchen and half bath at second floor.Details
relocate existing kitchen and half bath at second floor. | $10,000 |
| Aug 29, 2008 | Completed final sign-off Nov 2008 | 1932 Webster St | replace kitchen cabinet and counter top. n o change in floor plan.Details
replace kitchen cabinet and counter top. n o change in floor plan. | $3,000 |
| Feb 13, 2008 | Completed final sign-off May 2008 | 1846 Larkin St | bathroom-replace tub, toilet, sink and tiles, kitchen-replace cabinets, counter and sink, patch wall holes and paintDetails
bathroom-replace tub, toilet, sink and tiles, kitchen-replace cabinets, counter and sink, patch wall holes and paint | $13,000 |
| Feb 12, 2008 | Completed final sign-off Jun 2008 | 1932 Webster St | correct violations per bid & his report for condo conversion. 3- r report # 4420. # 3. remove illegal enclosure and stairs. #6, install new battery detectors, #8 & 13. remove dead bolt lock. # 9 new battery smoke detectors, remodel kitchen. work to be done on 1934 webster.Details
correct violations per bid & his report for condo conversion. 3- r report # 4420. # 3. remove illegal enclosure and stairs. #6, install new battery detectors, #8 & 13. remove dead bolt lock. # 9 new battery smoke detectors, remodel kitchen. work to be done on 1934 webster. | $45,000 |
| Mar 9, 2005 | Completed final sign-off Jun 2005 | 1846 Larkin St | remodel kitchen & bathroom- replace cabinet, vinyl floors & paint.toilet,sink&tiles.no structural wkDetails
remodel kitchen & bathroom- replace cabinet, vinyl floors & paint.toilet,sink&tiles.no structural wk | $12,500 |
| Apr 9, 2002 | Completed final sign-off Sep 2002 | 1273 Green St | kitchen & bathroom upgrade. drywall and painting. (no structural changes)Details
kitchen & bathroom upgrade. drywall and painting. (no structural changes) | $8,000 |