Back to kitchen remodel contractors
C C I Builders
- Based in
- San Francisco
- On San Francisco permits
- Apr 2009 to Feb 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 2 days from filing to permit and 47 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2010 | Completed final sign-off Feb 2010 | 1427 Silver Av | remove (e) kitchen cabinets & replace with new size for size, upgrade (e) electrical panel & circuits. remove/replace kitchen sink. provide min 50% of kitchen lights wattage in h.e. lightsDetails
remove (e) kitchen cabinets & replace with new size for size, upgrade (e) electrical panel & circuits. remove/replace kitchen sink. provide min 50% of kitchen lights wattage in h.e. lights | $6,800 |
| Apr 9, 2009 | Completed final sign-off May 2009 | 715 Capitol Av | remove existing kitchen cabinets, replace size for size. update eletrical outlets in kitchen. no lighting change.Details
remove existing kitchen cabinets, replace size for size. update eletrical outlets in kitchen. no lighting change. | $4,800 |