Back to kitchen remodel contractors
C & C Goodmen Construction, Inc.
- Based in
- Daly City
- On San Francisco permits
- Jul 2005 to Oct 2007
- Last 24 months
- 0 permits filed
18 permits since 2000: 12 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 179 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2007 | Completed final sign-off Jul 2007 | 750 36th Av | remodel (e) kitchen & convert (e0 half bath on second floor into a full bath. lighting to comply with title 24 energy codes.Details
remodel (e) kitchen & convert (e0 half bath on second floor into a full bath. lighting to comply with title 24 energy codes. | $20,000 |
| Jan 16, 2007 | Completed final sign-off Apr 2008 | 1729 14th Av | 1/f- add bathroom, storage, entry door. 2/f- remodel living, dining, kitchen & powder bath. 3/f- remodel master suite & bath. remodel front facade. voluntary seismic strengthening at second story shearwalls.Details
1/f- add bathroom, storage, entry door. 2/f- remodel living, dining, kitchen & powder bath. 3/f- remodel master suite & bath. remodel front facade. voluntary seismic strengthening at second story shearwalls. | $150,000 |
| Jul 13, 2006 | Completed final sign-off Oct 2006 | 2436 Balboa St | to add one half bathroom & remodel (e) kitchen on (e) 2nd floor and 3rd floor per plan, replace (e) 2 furnace and 3 water heater on g/fDetails
to add one half bathroom & remodel (e) kitchen on (e) 2nd floor and 3rd floor per plan, replace (e) 2 furnace and 3 water heater on g/f | $30,000 |
| Apr 19, 2006 | Expired or cancelled expired May 2007 | 660 Natoma St | revision to appl#200504260910 per plans. relocate south-west unit (left side unit), living room & kitchen on 1st/2nd floors, convert shower to bath tub, relocate 1st floor heater to ground floor, relocate ground floor water heater, south-west unit, heater to above bedroom closet on (e) 2nd floor.Details
revision to appl#200504260910 per plans. relocate south-west unit (left side unit), living room & kitchen on 1st/2nd floors, convert shower to bath tub, relocate 1st floor heater to ground floor, relocate ground floor water heater, south-west unit, heater to above bedroom closet on (e) 2nd floor. | $500 |
| Nov 8, 2005 | Never finaled issued Nov 2005, no final | 2314 36th Av | remodel existing kitchen & 2 baths on main level.Details
remodel existing kitchen & 2 baths on main level. | $35,000 |
| Sep 26, 2005 | Completed final sign-off Mar 2006 | 731 32nd Av | revision: 200509203414 reolocate e furnace/wtr heater garage area, reduce exist half bath 1st fl, remove exist bear wall to convert e breakfasting room to n family use and also make 6' opening betwn kitchen/din rm. relocate laundry roomDetails
revision: 200509203414 reolocate e furnace/wtr heater garage area, reduce exist half bath 1st fl, remove exist bear wall to convert e breakfasting room to n family use and also make 6' opening betwn kitchen/din rm. relocate laundry room | $3,000 |
| Sep 20, 2005 | Completed final sign-off Mar 2006 | 731 32nd Av | remodel existing bath room on ground floor , 1st floor & 2nd floor remodel existing kitchen on 1stDetails
remodel existing bath room on ground floor , 1st floor & 2nd floor remodel existing kitchen on 1st | $100,000 |