Back to kitchen remodel contractors
C & C Construction
- Based in
- Oakland
- On San Francisco permits
- Aug 2006 to Aug 2015
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 expired or cancelled. Typically 3 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2014 | Expired or cancelled expired Jul 2015 | 1750 39th Av | remodel kitchen, remodel bathroom, furnace replace, new electric service, windows-replace (u factor 0.4 max). no structural work.Details
remodel kitchen, remodel bathroom, furnace replace, new electric service, windows-replace (u factor 0.4 max). no structural work. | $25,000 |
| Nov 8, 2007 | Completed final sign-off Feb 2008 | 1263 34th Av | to comply nov #200725171 dated 10/5/07. to legalize and demo entire kitchen area, remove/demo direct entrance door to basement, install self-closing s/c door from garage area to basement section; remove/cap off all plumbing pipes in the kithcen area. remove (e) bedrooms to storage, and offices.Details
to comply nov #200725171 dated 10/5/07. to legalize and demo entire kitchen area, remove/demo direct entrance door to basement, install self-closing s/c door from garage area to basement section; remove/cap off all plumbing pipes in the kithcen area. remove (e) bedrooms to storage, and offices. | $18,600 |