Back to bathroom remodel contractors
C.B Pro, Inc.
- Based in
- Oakland
- On San Francisco permits
- May 2025 to Sep 2026
- Last 24 months
- 9 permits filed
9 permits since 2000: 4 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 46 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 217 Kearny St | cosmetic tenat replacement. bathroom replace cashier counter top @ bar location, paintDetails
cosmetic tenat replacement. bathroom replace cashier counter top @ bar location, paint | $78,000 |
| Jun 23, 2025 | Completed final sign-off Jul 2025 | 2038 Mission St | replace lighting fixtures total (26). replace ceiling tiles (24" x 48" usg. 90 pc +-). paint order express as company colors (paint interior only). replace bathroom sink. no other work proposed or authorized.Details
replace lighting fixtures total (26). replace ceiling tiles (24" x 48" usg. 90 pc +-). paint order express as company colors (paint interior only). replace bathroom sink. no other work proposed or authorized. | $12,680 |
| May 13, 2025 | Completed final sign-off Jan 2026 | 1248 09th Av | cosmetic remodel only. replace sink, toilet, floor tiles and paint. 1 bathroom. change of use from gift shop to restaurant.Details
cosmetic remodel only. replace sink, toilet, floor tiles and paint. 1 bathroom. change of use from gift shop to restaurant. | $6,800 |