Block 1742, lot 027
1248 09th Ave
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 3
- Rooms
- 4 bathrooms
- Building
- 4,788 sq ft
- Lot
- 2,996 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2025 | Completed final sign-off Jan 2026 | 1248 09th Av | C.B Pro, Inc. | cosmetic remodel only. replace sink, toilet, floor tiles and paint. 1 bathroom. change of use from gift shop to restaurant.Details
cosmetic remodel only. replace sink, toilet, floor tiles and paint. 1 bathroom. change of use from gift shop to restaurant. | $6,800 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 1246 09th Av | streetspace | ||
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 1246 09th Av | street space | ||
| May 10, 2019 | Expired or cancelled withdrawn May 2025 | 1248 09th Av | installed and added a turbofan moffat oven in extg cafe. for dph review only. please route to mechanicalDetails
installed and added a turbofan moffat oven in extg cafe. for dph review only. please route to mechanical | ||
| Oct 23, 2018 | Completed final sign-off Jan 2019 | 1246 09th Av | 20 new windows both units at lightwells, and rear non visible , replace (12) front windows in kind w/souble hung wood windows w/ogee details- same openinsDetails
20 new windows both units at lightwells, and rear non visible , replace (12) front windows in kind w/souble hung wood windows w/ogee details- same openins | $35,800 | |
| Apr 29, 2013 | Completed final sign-off May 2015 | 1248 09th Av | creating a small self-service bar for coffee, espresso & scoop ice. very minimal improvements to (e) electrical & plumbing.Details
creating a small self-service bar for coffee, espresso & scoop ice. very minimal improvements to (e) electrical & plumbing. | $3,000 | |
| Oct 4, 2012 | Completed final sign-off Oct 2012 | 1246 09th Av | to comply with nov #200341564; reverting back to last legal use "retail store" no change in use; no work to be done under this permit.Details
to comply with nov #200341564; reverting back to last legal use "retail store" no change in use; no work to be done under this permit. | ||
| Aug 4, 2004 | Completed final sign-off Sep 2004 | 1246 09th Av | fix rear deck and stairs/reinforce stringer/to comply with complaint #200449219Details
fix rear deck and stairs/reinforce stringer/to comply with complaint #200449219 | $800 | |
| Jun 30, 2003 | Never finaled issued Jun 2004, no final | 1248 09th Av | no work planned. change as of use from retail to pilates health stretching studioDetails
no work planned. change as of use from retail to pilates health stretching studio | ||
| Aug 9, 2001 | Expired or cancelled expired Dec 2001 | 1248 09th Av | to renew app#9905571 for final inspection.Details
to renew app#9905571 for final inspection. | ||
| May 15, 2000 | Expired or cancelled expired Sep 2000 | 1248 09th Av | renewal of pa 9905571 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- C.B Pro, Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.