Back to kitchen remodel contractors
C A Mc Kee Construction
- Based in
- Alamo
- On San Francisco permits
- Apr 2009 to May 2026
- Last 24 months
- 5 permits filed
24 permits since 2000: 16 completed, 5 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 8 completed, 2 in progress, 2 expired or cancelled. Typically 6 days from filing to permit and 711 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2026 | In progress issued May 2026 | 2000 Washington St | update 104 powder room and 113 primary bath 2 in kind. new lighting and replace e switching. new av system. repair windows, replace north facing windows in kind. replace appliances in kitchen, new study w new opening and pocketdoors. appliances, sink, stone island at kitchenDetails
update 104 powder room and 113 primary bath 2 in kind. new lighting and replace e switching. new av system. repair windows, replace north facing windows in kind. replace appliances in kitchen, new study w new opening and pocketdoors. appliances, sink, stone island at kitchen | $200,000 |
| Dec 12, 2025 | In progress issued Dec 2025 | 2440 Pacific Av | 1/fl- (n) ice maker and undercounter refrigerator at family lounge and electric outlet of kitchen. replace 2 refrigators and faucet at kitchen. replace sink and toilet at powder. floor 2 replace toilet at master wc. floor 3 replace 2 toilets at baths. replace wall to wall carpet. repair andDetails
1/fl- (n) ice maker and undercounter refrigerator at family lounge and electric outlet of kitchen. replace 2 refrigators and faucet at kitchen. replace sink and toilet at powder. floor 2 replace toilet at master wc. floor 3 replace 2 toilets at baths. replace wall to wall carpet. repair and | $250,000 |
| Jul 13, 2022 | Completed final sign-off May 2025 | 2000 Washington St | unit 5: reconfigure interior non structural partition walls. remodel kitchen and all baths. replace exterior windows in kind. no changes to exterior.Details
unit 5: reconfigure interior non structural partition walls. remodel kitchen and all baths. replace exterior windows in kind. no changes to exterior. | $1,000,000 |
| Dec 14, 2021 | Completed final sign-off Sep 2022 | 1080 Chestnut St | apt 3b: rebuild non bearing, non structural walls. remodel existing kitchen, bath and half bath in place.Details
apt 3b: rebuild non bearing, non structural walls. remodel existing kitchen, bath and half bath in place. | $150,000 |
| Nov 22, 2021 | Completed final sign-off Feb 2026 | 2000 Washington St | unit 1: reconfigure interior non structural partition walls. remodel kitchen and all baths. replace all exterior windows in kind, no design changes to the exterior.Details
unit 1: reconfigure interior non structural partition walls. remodel kitchen and all baths. replace all exterior windows in kind, no design changes to the exterior. | $2,000,000 |
| Nov 20, 2014 | Expired or cancelled cancelled Jan 2026 | 2000 Washington St | reconfigure interior partition walls, remodel kitchen and all bathsDetails
reconfigure interior partition walls, remodel kitchen and all baths | $500,000 |
| Nov 20, 2014 | Completed final sign-off May 2017 | 2000 Washington St | 3/f unit 3 -reconfigure interior partition walls. remodel the whole units;remodel kitchen and all bathDetails
3/f unit 3 -reconfigure interior partition walls. remodel the whole units;remodel kitchen and all bath | $500,000 |
| Sep 11, 2014 | Completed final sign-off Jul 2015 | 2000 Washington St | recondition kitchen cabinets, appliance plumbing fixtures, replace powder room bath with new fixtures.Details
recondition kitchen cabinets, appliance plumbing fixtures, replace powder room bath with new fixtures. | $125,000 |
| Feb 25, 2014 | Completed final sign-off Sep 2014 | 1170 Sacramento St | replace kitchen cabinets in same location new appliances, new sink, disposal etc, repaint , replace toilet.Details
replace kitchen cabinets in same location new appliances, new sink, disposal etc, repaint , replace toilet. | $12,000 |
| Nov 1, 2013 | Completed final sign-off Sep 2015 | 2006 Washington St | work in unit #1: remodel 2 bathrooms, remodel kitchen. some interior partitions reconfigured. millwork refinishingDetails
work in unit #1: remodel 2 bathrooms, remodel kitchen. some interior partitions reconfigured. millwork refinishing | $225,000 |
| Jun 30, 2011 | Completed final sign-off Jul 2013 | 2000 Washington St | unit #5:remodel 2 full baths, 2 1/2 baths, 1 kitchen, paint, new hardwood floors misc trim, new elec trim, plumbing as necessary.new fire place.Details
unit #5:remodel 2 full baths, 2 1/2 baths, 1 kitchen, paint, new hardwood floors misc trim, new elec trim, plumbing as necessary.new fire place. | $235,000 |
| Apr 3, 2009 | Expired or cancelled expired Jul 2010 | 1170 Sacramento St | kitchen remodel-wall paneling, replace plumbing fixtures in bathrooms. move non-bearing wall in kitchen & closet/bathroom. new electrical fixtures in dining room.Details
kitchen remodel-wall paneling, replace plumbing fixtures in bathrooms. move non-bearing wall in kitchen & closet/bathroom. new electrical fixtures in dining room. | $160,000 |