Burton's Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2015 to Aug 2022
- Last 24 months
- 0 permits filed
18 permits since 2000: 13 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 10 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2018 | Completed final sign-off Jun 2018 | 186 Lexington St | replace (e) stairs in lighwell in same configuration in accordance with sfbc 1011.12.3 and cebc 2016 403.1.Details
replace (e) stairs in lighwell in same configuration in accordance with sfbc 1011.12.3 and cebc 2016 403.1. | $20,000 |
| Apr 6, 2017 | Completed final sign-off Jun 2017 | 190 Lexington St | repair to existing, exterior solid wood stair railing to correct rot. repair to match in kind. no change to landing dimensions or design of the stair/railing.Details
repair to existing, exterior solid wood stair railing to correct rot. repair to match in kind. no change to landing dimensions or design of the stair/railing. | $3,000 |