Back to bathroom remodel contractors
Built By Todd
- Based in
- San Francisco
- On San Francisco permits
- Feb 2010 to Mar 2019
- Last 24 months
- 0 permits filed
23 permits since 2000: 22 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 285 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2019 | Completed final sign-off Feb 2020 | 1270 39th Av | replace 5 windows at front, add lower bedroom, finish lower bath, replace footing under sunroom, add shear wall at rearDetails
replace 5 windows at front, add lower bedroom, finish lower bath, replace footing under sunroom, add shear wall at rear | $20,000 |
| Dec 22, 2017 | Completed final sign-off Nov 2018 | 1270 39th Av | replace 14 windows in kind not visible from the street. new slab at garage. relocate interior stairs, remove extg 1st floor family room, replace with new lower entry, add master bath, and relocate laundry to 2nd floor.Details
replace 14 windows in kind not visible from the street. new slab at garage. relocate interior stairs, remove extg 1st floor family room, replace with new lower entry, add master bath, and relocate laundry to 2nd floor. | $50,000 |
| Aug 15, 2016 | Completed final sign-off Sep 2017 | 1275 39th Av | replace 5 windows at front, in kind. add approx 300 sq.ft. at garage level within (e) bldg. envelope 1 bathroom, 1 bedroom & 1 laundry. remodel 2/f main bath, hallway & entry, remove non load bearing walls, add bath fan, add skylight at entry.Details
replace 5 windows at front, in kind. add approx 300 sq.ft. at garage level within (e) bldg. envelope 1 bathroom, 1 bedroom & 1 laundry. remodel 2/f main bath, hallway & entry, remove non load bearing walls, add bath fan, add skylight at entry. | $50,000 |
| Mar 25, 2015 | Completed final sign-off Jan 2016 | 367 Church St | bathroom remodel - replace tub, tile, sink & toilet - #6Details
bathroom remodel - replace tub, tile, sink & toilet - #6 | $7,000 |
| Dec 23, 2014 | Completed final sign-off Oct 2015 | 1275 39th Av | add master bathroom, no additional sq.ft. added, add skylight and bath fan. replace one door with window in existing opening.Details
add master bathroom, no additional sq.ft. added, add skylight and bath fan. replace one door with window in existing opening. | $15,000 |
| Dec 23, 2014 | Completed final sign-off May 2015 | 367 Church St | unit #1: bathroom remodel, replace tub, tile, sink, add bath fan. no structural workDetails
unit #1: bathroom remodel, replace tub, tile, sink, add bath fan. no structural work | $10,000 |
| Jun 3, 2014 | Completed final sign-off Jul 2014 | 168 Prospect Av | bathroom remodel, - replace tub, tile, toilet,cabinet, sink , add bath fan at second floor.Details
bathroom remodel, - replace tub, tile, toilet,cabinet, sink , add bath fan at second floor. | $10,000 |
| Jun 25, 2012 | Completed final sign-off Dec 2012 | 2025 15th St | convert 1/4 bath to full bath. add wall, shower, toilet, sink, fan, elec. plumbing. lower ceiling to 9'. remove and cover 1 window on side of building. replace 1 window at rear. no structural changesDetails
convert 1/4 bath to full bath. add wall, shower, toilet, sink, fan, elec. plumbing. lower ceiling to 9'. remove and cover 1 window on side of building. replace 1 window at rear. no structural changes | $21,000 |
| Jun 14, 2012 | Completed final sign-off Aug 2012 | 374 Guerrero St | bathroom remodelDetails
bathroom remodel | $11,000 |