Back to kitchen remodel contractors
Building Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Jun 2015
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2015 | Completed final sign-off Jul 2016 | 547 Masonic Av | legalize in law unit on ground floor per plan - 2 bedrooms, 2 bathrooms, 1 living room and 1 kitchen per ordinance 43-14Details
legalize in law unit on ground floor per plan - 2 bedrooms, 2 bathrooms, 1 living room and 1 kitchen per ordinance 43-14 | $10,000 |
| Sep 19, 2011 | Completed final sign-off Jun 2012 | 1411 35th Av | relocate stairs leading to garage & infill opening w/framing to match (e) in kind @ 2nd flr, reconfigure kitchen/dining rm. add master bath. repl all windows. remove non warranted rms, add 2 bedrms, 1 bath & storage rm. install sliding dr in bedrms, repl furnace/water heater. electrical wDetails
relocate stairs leading to garage & infill opening w/framing to match (e) in kind @ 2nd flr, reconfigure kitchen/dining rm. add master bath. repl all windows. remove non warranted rms, add 2 bedrms, 1 bath & storage rm. install sliding dr in bedrms, repl furnace/water heater. electrical w | $70,000 |
| Aug 16, 2010 | Expired or cancelled expired Jun 2012 | 265 Victoria St | 2nd fl: relocate stairs, convert dining rm to 3rd bedroom, remodel kitchen, master bath, 2nd bath. add laundry room, replace windows in kind. gr fl : reconfigure family rm and bath 3. add storage rm, install new windows. replace furnace and water heater, upgrade mech piping, ductwork,plumbing.Details
2nd fl: relocate stairs, convert dining rm to 3rd bedroom, remodel kitchen, master bath, 2nd bath. add laundry room, replace windows in kind. gr fl : reconfigure family rm and bath 3. add storage rm, install new windows. replace furnace and water heater, upgrade mech piping, ductwork,plumbing. | $50,000 |
| Mar 3, 2010 | Never finaled issued Mar 2010, no final | 3174 San Jose Av | relocate kitchen on 2nd fl.remove partition wall between kitchen & living rm, add skylight in kitchen, add bath & closet in new master suite, relocate bedroom. elocate & resize windows in rear. remove (e)lightwell.resize hallway bath on 2nd fl.re-route heating ductwork & insulation. new lightsDetails
relocate kitchen on 2nd fl.remove partition wall between kitchen & living rm, add skylight in kitchen, add bath & closet in new master suite, relocate bedroom. elocate & resize windows in rear. remove (e)lightwell.resize hallway bath on 2nd fl.re-route heating ductwork & insulation. new lights | $80,000 |