Back to kitchen remodel contractors
Buck O'neill Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Aug 2026
- Last 24 months
- 10 permits filed
93 permits since 2000: 69 completed, 6 in progress, 10 never finaled, 8 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 7 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 19 completed, 2 never finaled. Typically 1 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2024 | Completed final sign-off Feb 2025 | 1359 05th Av | kitchen remodel: replace cabinets, plumbing, appliances in kind. bathroom remodel: replace vanity, plumbing in kind. guest bath: replace vanity.Details
kitchen remodel: replace cabinets, plumbing, appliances in kind. bathroom remodel: replace vanity, plumbing in kind. guest bath: replace vanity. | $85,000 |
| Oct 12, 2023 | Completed final sign-off Apr 2026 | 2917 California St | inter reno including kitchen, powder rm, & full bathrm. reconf of garage access stair, relocated & upgrade hvac & water heater, relocate & enlarge (e) attic hatch w/(n) folding ladder, add (n) roof service hatch, upgrade elec & lighting throughout. replace siding & windows @ east & south, not visiblDetails
inter reno including kitchen, powder rm, & full bathrm. reconf of garage access stair, relocated & upgrade hvac & water heater, relocate & enlarge (e) attic hatch w/(n) folding ladder, add (n) roof service hatch, upgrade elec & lighting throughout. replace siding & windows @ east & south, not visibl | $150,000 |
| Jun 2, 2022 | Completed final sign-off Aug 2023 | 2710 California St | interior non-structural kitchen remodel- rework cabinets, reconstruct island, replace countertops and some appliances. no removal of walls, no change in use and no change to means of egress.Details
interior non-structural kitchen remodel- rework cabinets, reconstruct island, replace countertops and some appliances. no removal of walls, no change in use and no change to means of egress. | $150,000 |
| Oct 30, 2020 | Never finaled issued Aug 2021, no final | 2615 Larkin St | rev to pa 2019013016664. deck layout & details modified, added kitchen on roofDetails
rev to pa 2019013016664. deck layout & details modified, added kitchen on roof | $20,000 |
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 2710 California St | revision to permit #201805108819. reducing scope - omit 1 upstairs bathroom, omit kitchen - new cabinets, counter, flooring & fixtures, omit sitting room new shelves.Details
revision to permit #201805108819. reducing scope - omit 1 upstairs bathroom, omit kitchen - new cabinets, counter, flooring & fixtures, omit sitting room new shelves. | |
| Jan 12, 2018 | Completed final sign-off May 2018 | 1816 10th Av | kitchen cabinets being replaced, new electrical and plumbing, insulation & rock (1) bathroom. no change in (e) layoutDetails
kitchen cabinets being replaced, new electrical and plumbing, insulation & rock (1) bathroom. no change in (e) layout | $75,000 |
| Sep 17, 2015 | Completed final sign-off Feb 2017 | 309 Allison St | interior remodel to a 2 story residence. interior remodel will include an (e) kitchen on the upper level and a (n) bath and habitable space in the lower level. proposed demolition and (n) construction will be limited to interior walls, finishes and electrical and plumbing workDetails
interior remodel to a 2 story residence. interior remodel will include an (e) kitchen on the upper level and a (n) bath and habitable space in the lower level. proposed demolition and (n) construction will be limited to interior walls, finishes and electrical and plumbing work | $50,000 |
| Jul 13, 2015 | Completed final sign-off Feb 2016 | 1 South Park | convert one bath into a closet, upgrade one other with new cabinets, under counter lights at kitchen upper cabinets. n/a maher ordinanceDetails
convert one bath into a closet, upgrade one other with new cabinets, under counter lights at kitchen upper cabinets. n/a maher ordinance | $60,000 |
| Jun 23, 2014 | Completed final sign-off Mar 2015 | 1084 De Haro St | interior renovation, scope of work includes: remodel (e) kitchen at 3/f, relocate (e) furnace & remodel (e) wet bar on 4/f, replace windows & plumbing fixtures throughout in kind.Details
interior renovation, scope of work includes: remodel (e) kitchen at 3/f, relocate (e) furnace & remodel (e) wet bar on 4/f, replace windows & plumbing fixtures throughout in kind. | $40,000 |
| May 16, 2014 | Completed final sign-off Nov 2014 | 441 Day St | kitchen remodel: remove 2 windows and 1 door. add 1 window, widen door in (e) shear wall. window not visible from street. shear wall improvement. bathroom remodel on third floor.Details
kitchen remodel: remove 2 windows and 1 door. add 1 window, widen door in (e) shear wall. window not visible from street. shear wall improvement. bathroom remodel on third floor. | $90,000 |
| Apr 3, 2014 | Completed final sign-off Jun 2014 | 616 20th St | add 4 electrical circuits at new kitchen cabinets, new cabinets /shelving/projecton screen drapes, no walls removed; compliance with ord 155-13 not requiredDetails
add 4 electrical circuits at new kitchen cabinets, new cabinets /shelving/projecton screen drapes, no walls removed; compliance with ord 155-13 not required | $45,000 |
| Mar 20, 2014 | Completed final sign-off Jul 2014 | 88 King St | unit #110: 1221 sq. ft renovation to an extg apartment. the renovation will include cosmetic upgrade to the kitchen and master bedroom. no structural changes.Details
unit #110: 1221 sq. ft renovation to an extg apartment. the renovation will include cosmetic upgrade to the kitchen and master bedroom. no structural changes. | $90,000 |
| Mar 18, 2013 | Completed final sign-off Aug 2013 | 1970 Scott St | replace in unit # 2 w/new kitchen cabinets, counter tops & flooringDetails
replace in unit # 2 w/new kitchen cabinets, counter tops & flooring | $30,000 |
| Feb 21, 2013 | Completed final sign-off Apr 2016 | 662 Waller St | remodel an (e) 2 level residence within 2 unit bldg. remodel includes partial demo of (e) walls & roof, (n) interior & exterior walls, (n) dormers, (n) windows @ light wells & rear facade & 2 (n) bathrooms, 1 remodel bathroom & 1 remodel kitchen.Details
remodel an (e) 2 level residence within 2 unit bldg. remodel includes partial demo of (e) walls & roof, (n) interior & exterior walls, (n) dormers, (n) windows @ light wells & rear facade & 2 (n) bathrooms, 1 remodel bathroom & 1 remodel kitchen. | $150,000 |
| Dec 27, 2012 | Completed final sign-off Jun 2013 | 2154 Sutter St | reconfiguring existing interior space, including remodeling the kitchen, family room & dining within a single unit of a 3 unit residential bldg. 4 story bldg over a garage. no new floor area added. remove wall b/w kithcen & family room.Details
reconfiguring existing interior space, including remodeling the kitchen, family room & dining within a single unit of a 3 unit residential bldg. 4 story bldg over a garage. no new floor area added. remove wall b/w kithcen & family room. | $75,000 |
| Jul 27, 2011 | Completed final sign-off Jan 2012 | 101 San Pablo Av | interior remodel of (e) kitchen/den & addition of entry vestibule at rear. dem include portions exterior walls, concrete slab, elec & plbg components, interior finishes. new work includes concrete slab & foundtion, struct & non-structu walls, finishes, elec & plbg component.Details
interior remodel of (e) kitchen/den & addition of entry vestibule at rear. dem include portions exterior walls, concrete slab, elec & plbg components, interior finishes. new work includes concrete slab & foundtion, struct & non-structu walls, finishes, elec & plbg component. | $90,000 |
| Oct 5, 2010 | Completed final sign-off Jul 2011 | 1250 Missouri St | unit#2. t.i. to (e) commercial space, partial demo of non structural walls & finishes & stairs. new non structural walls, stairs & kitchenette. new electrical work, hvac & plumbing under trade permitDetails
unit#2. t.i. to (e) commercial space, partial demo of non structural walls & finishes & stairs. new non structural walls, stairs & kitchenette. new electrical work, hvac & plumbing under trade permit | $65,000 |
| Jul 23, 2010 | Completed final sign-off Sep 2010 | 60 Arguello Bl | kitchen remodel replace cabinetry in kind. master bath remodel of finishes stone -tile ( min gyp), kids bath remodel , laundry in 2nd flDetails
kitchen remodel replace cabinetry in kind. master bath remodel of finishes stone -tile ( min gyp), kids bath remodel , laundry in 2nd fl | $150,000 |
| Mar 8, 2010 | Completed final sign-off Aug 2010 | 3690 21st St | revision to pa# 2009-0826-5623-kitchen trusses & balcony supports. reframe (e) roof at kitchen in kindDetails
revision to pa# 2009-0826-5623-kitchen trusses & balcony supports. reframe (e) roof at kitchen in kind | |
| Aug 26, 2009 | Completed final sign-off Oct 2012 | 3690 21st St | new skylight, new roof at sunroom, new roof terrace, new windows on pl, reconfigure rear stairs, new balcony. interior remodel incl. kitchen,library, new master full bathroom.Details
new skylight, new roof at sunroom, new roof terrace, new windows on pl, reconfigure rear stairs, new balcony. interior remodel incl. kitchen,library, new master full bathroom. | $400,000 |
| Sep 9, 2008 | Completed final sign-off Oct 2008 | 3690 21st St | exploratory demolition of kitchen/family area part of floor/wall. in basement for dryrot repair. at master bath to verify routing of vents and drains. strips of walls and opening in floors to gain access and survey (e) condition.Details
exploratory demolition of kitchen/family area part of floor/wall. in basement for dryrot repair. at master bath to verify routing of vents and drains. strips of walls and opening in floors to gain access and survey (e) condition. | $5,000 |