Brunton Construction
- Based in
- Pacifca
- On San Francisco permits
- Aug 2007 to Apr 2026
- Last 24 months
- 2 permits filed
12 permits since 2000: 10 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 in progress. Typically 20 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2025 | In progress issued Mar 2025 | 1638 25th Av | demo bricks from e) front stairs, repair leaks, re-install bricks, less 50%. no work will effect public rowDetails
demo bricks from e) front stairs, repair leaks, re-install bricks, less 50%. no work will effect public row | $17,200 |
| Mar 15, 2024 | Completed final sign-off Sep 2024 | 1497 Potrero Av | interior remodel to (e) live work unit #5: remove (e) interior stair, move to (n) location- remove & relocate (e) bathroom at mezzanine level, infill (e) opening- add (n) non-structural partition walls to create (n) lobby & storage area. minor electrical work- no other work, no mezzanine expansionDetails
interior remodel to (e) live work unit #5: remove (e) interior stair, move to (n) location- remove & relocate (e) bathroom at mezzanine level, infill (e) opening- add (n) non-structural partition walls to create (n) lobby & storage area. minor electrical work- no other work, no mezzanine expansion | $40,000 |
| Apr 27, 2022 | Completed final sign-off Jan 2023 | 1644 Funston Av | remove existing brick steps from front entrance stairs and replace with new brick steps. all work in-kind.Details
remove existing brick steps from front entrance stairs and replace with new brick steps. all work in-kind. | $6,000 |
| May 25, 2018 | Completed final sign-off Dec 2018 | 3130 Steiner St | replace entry stairs from steiner street. improve rise and run and landing conditions by extending stair onto sidewalk. add planters on ea side of stair to act as barrier and beautifyDetails
replace entry stairs from steiner street. improve rise and run and landing conditions by extending stair onto sidewalk. add planters on ea side of stair to act as barrier and beautify | $6,000 |