Back to kitchen remodel contractors
Brothers Lui Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Aug 2024
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 1 days from filing to permit and 229 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2024 | Completed final sign-off Jan 2026 | 416 Quintara St | reconfigure (e) interior staircase to comply w/ current building code. remodel like for like bathroom, bedrooms, and add (n) laundry room on 1/f. convert (e) bedroom into master suite, kitchen, and bathroom remodel on 2/f.Details
reconfigure (e) interior staircase to comply w/ current building code. remodel like for like bathroom, bedrooms, and add (n) laundry room on 1/f. convert (e) bedroom into master suite, kitchen, and bathroom remodel on 2/f. | $200,000 |
| Aug 26, 2015 | Completed final sign-off Jun 2016 | 135 Evelyn Wy | revision to permit 201506229551; relocate bedroom, bathroom & kitchen from approved plan.Details
revision to permit 201506229551; relocate bedroom, bathroom & kitchen from approved plan. | $10 |
| Jun 22, 2015 | Completed final sign-off Jun 2016 | 135 Evelyn Wy | remodel 1st floor to have 1 bedroom, 1 full bathroom & 2 storage rooms. install new gas furnace, water heater & laundry hook-up, 1 sink. remodel 2nd floor kitchen with new fixtures, cabinets, countertop. remodel existing bathroom, add 1 full bathroom. replace all windows.Details
remodel 1st floor to have 1 bedroom, 1 full bathroom & 2 storage rooms. install new gas furnace, water heater & laundry hook-up, 1 sink. remodel 2nd floor kitchen with new fixtures, cabinets, countertop. remodel existing bathroom, add 1 full bathroom. replace all windows. | $55,000 |
| Oct 8, 2010 | Completed final sign-off Dec 2010 | 1825 37th Av | upper floor: 1. remodel kitchen - replace cabinet, counter top & floor tile. 2. remodel bathroom - replace tub shower, toilet, sink & tile. ground floor: replace old furance with new furance. no wall relocation.Details
upper floor: 1. remodel kitchen - replace cabinet, counter top & floor tile. 2. remodel bathroom - replace tub shower, toilet, sink & tile. ground floor: replace old furance with new furance. no wall relocation. | $20,000 |
| Jul 6, 2010 | Completed final sign-off Feb 2011 | 786 37th Av | 1st floor:remodeling of kitchen. replace cabinet, countertop, sink and floor tile.Details
1st floor:remodeling of kitchen. replace cabinet, countertop, sink and floor tile. | $9,240 |
| Mar 2, 2010 | Completed final sign-off Aug 2010 | 84 Sylvan Dr | ground flr.:construct (n) fire rated wall to separate proposed 2-bedrms., barhrm. w/ tub, storage rm. & the laundry area & upgrade (e) elec. panel to 100m. upper flr. remodel kitchen-replace cab. & flr. tile, 2-bathrm. replace tub, toilet & sink, tile. add 1-full bath w/ shower.Details
ground flr.:construct (n) fire rated wall to separate proposed 2-bedrms., barhrm. w/ tub, storage rm. & the laundry area & upgrade (e) elec. panel to 100m. upper flr. remodel kitchen-replace cab. & flr. tile, 2-bathrm. replace tub, toilet & sink, tile. add 1-full bath w/ shower. | $25,000 |
| Jun 17, 2009 | Completed final sign-off Feb 2010 | 2301 34th Av | remodel ground floor to have 2 bedrooms, 1 family rm, 1 game room, 1 full bathroom & 1 storage rm. install new gas furnaces, water heater & laundry hook-up. remodel 2nd floor kitchen with new fixtures, cabinets, countertop. remodel 1 existing full bathrm. add 1 office, 1 full bathrm & half bathrm.Details
remodel ground floor to have 2 bedrooms, 1 family rm, 1 game room, 1 full bathroom & 1 storage rm. install new gas furnaces, water heater & laundry hook-up. remodel 2nd floor kitchen with new fixtures, cabinets, countertop. remodel 1 existing full bathrm. add 1 office, 1 full bathrm & half bathrm. | $95,000 |