Back to kitchen remodel contractors
Brotherhu Builders Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2024 to May 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 8 days from filing to permit and 349 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2025 | Completed final sign-off May 2026 | 6918 Fulton St | relocate the kitchen to (e) dining room at 2nd fl. convert current kitchen into a study room at 2nd fl. remove (e) shower to remodel (e) bathroom at 2nd fl. upgrade electrical service to 200 ampDetails
relocate the kitchen to (e) dining room at 2nd fl. convert current kitchen into a study room at 2nd fl. remove (e) shower to remodel (e) bathroom at 2nd fl. upgrade electrical service to 200 amp | $40,000 |