Back to kitchen remodel contractors
Brother & Brother Builders
- Based in
- San Jose
- On San Francisco permits
- Mar 2017 to Nov 2025
- Last 24 months
- 2 permits filed
16 permits since 2000: 10 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 322 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 12, 2023 | Completed final sign-off Sep 2024 | 1057 Prague St | expand/remodel kitchen on 2/f, structural strengthening to compensate for wall removal.Details
expand/remodel kitchen on 2/f, structural strengthening to compensate for wall removal. | $60,000 |
| May 6, 2021 | Completed final sign-off Jul 2021 | 28 Montcalm St | in-kind kitchen remodel (no change to the floor or walls) like for like. replacing everything in the same locatoins. subpanel replacements 125a to 125a,mp.Details
in-kind kitchen remodel (no change to the floor or walls) like for like. replacing everything in the same locatoins. subpanel replacements 125a to 125a,mp. | $25,000 |
| Mar 25, 2021 | Completed final sign-off Feb 2022 | 3347 Divisadero St | in-kind kitchen & (3) bathroom remodel, no change to floor plan/walls, like-for-like, all same locations, add recessed lighting.Details
in-kind kitchen & (3) bathroom remodel, no change to floor plan/walls, like-for-like, all same locations, add recessed lighting. | $55,000 |