Back to bathroom remodel contractors
Broc Built Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Jun 2026
- Last 24 months
- 7 permits filed
24 permits since 2000: 19 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 20 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2019 | Completed final sign-off Oct 2020 | 51 Pond St | bathroom remodel to include moving interior non-laod bearing wall, new windows of different size & location and new plm fixtures, finishes and cabinetryDetails
bathroom remodel to include moving interior non-laod bearing wall, new windows of different size & location and new plm fixtures, finishes and cabinetry | $20,000 |
| Mar 28, 2019 | Completed final sign-off Oct 2020 | 51 Pond St | relocate existing exterior door & add new landing to existing exterior stairs, add new bath to include plumbing fixtures & finishes.Details
relocate existing exterior door & add new landing to existing exterior stairs, add new bath to include plumbing fixtures & finishes. | $60,000 |
| May 8, 2018 | Completed final sign-off Sep 2018 | 2420 Gough St | shower pan repair (failed old one) renovate 1 bath room in kind - use old sink , old toilet. new shower tile floorsDetails
shower pan repair (failed old one) renovate 1 bath room in kind - use old sink , old toilet. new shower tile floors | $20,000 |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 1832 24th Av | complete one bathroom remodel. demo (e) bath room, remove tub, install new plumbing, electrical. replace shower and shower pan, new tiles, vanity and toilet. no change in walls & openings layout.Details
complete one bathroom remodel. demo (e) bath room, remove tub, install new plumbing, electrical. replace shower and shower pan, new tiles, vanity and toilet. no change in walls & openings layout. | $15,000 |
| Feb 28, 2018 | Completed final sign-off Sep 2018 | 2420 Gough St | residential remodel to include: kitchen remodel including new finishes, cabinetry & appliances. relocaion of (e) non-structural wall; demo of (e) shower & addition of new bathroom vanity; repair dry rot at (e) rear deck-less than 50%, replace in kind.Details
residential remodel to include: kitchen remodel including new finishes, cabinetry & appliances. relocaion of (e) non-structural wall; demo of (e) shower & addition of new bathroom vanity; repair dry rot at (e) rear deck-less than 50%, replace in kind. | $60,000 |
| Mar 7, 2016 | Expired or cancelled expired Oct 2025 | 2451 Bay St | interior renovation & addition to 3rd floor @ rear of property. new rear landscaping. 1 new bedroom & 1 new bathroom in addition. ** maher: n/a **Details
interior renovation & addition to 3rd floor @ rear of property. new rear landscaping. 1 new bedroom & 1 new bathroom in addition. ** maher: n/a ** | $429,349 |