Broc Built Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Jun 2026
- Last 24 months
- 7 permits filed
24 permits since 2000: 19 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2026 | Completed final sign-off Jul 2026 | 577 Alvarado St | to obtain final inspection for work approved under pa#202504245165. all work is complete.Details
to obtain final inspection for work approved under pa#202504245165. all work is complete. | |
| Oct 23, 2025 | Completed final sign-off Oct 2025 | 2451 Bay St | revision 20160071311 and ref 202510147345- update page a2.02 with (n) page on current planset to obtain final inspection. no work to be doneDetails
revision 20160071311 and ref 202510147345- update page a2.02 with (n) page on current planset to obtain final inspection. no work to be done | |
| Oct 14, 2025 | Completed final sign-off Oct 2025 | 2451 Bay St | to obtain final insepction for work approved under 201603071311. all work is completeDetails
to obtain final insepction for work approved under 201603071311. all work is complete | |
| Aug 12, 2025 | Completed final sign-off Oct 2025 | 2451 Bay St | revise windows in primary bedroom for pa # 2016-0307-1311Details
revise windows in primary bedroom for pa # 2016-0307-1311 | |
| Apr 24, 2025 | Completed final sign-off Oct 2025 | 2451 Bay St | rev to 201603071311: 2 (e) walls to remain, roof framing to be flat. revision to skylightsDetails
rev to 201603071311: 2 (e) walls to remain, roof framing to be flat. revision to skylights | |
| Apr 24, 2025 | Expired or cancelled expired Jul 2026 | 577 Alvarado St | revision to pa 2023-0808-4001 change to document as-built length of shearwall along building line a, no other work proposed.Details
revision to pa 2023-0808-4001 change to document as-built length of shearwall along building line a, no other work proposed. | |
| Feb 21, 2025 | Completed final sign-off Oct 2025 | 3006 Market St | remove an old hot tub, plumbing, & electrical. install new hot tub, plumbing, & electrical. tearing of surface boards of old deck & replacing w/ treated materials.Details
remove an old hot tub, plumbing, & electrical. install new hot tub, plumbing, & electrical. tearing of surface boards of old deck & replacing w/ treated materials. | $10,000 |
| Aug 16, 2024 | Completed final sign-off Mar 2025 | 2451 Bay St | ref pa # 2016-0307-1311 new backyard fenceDetails
ref pa # 2016-0307-1311 new backyard fence | |
| Aug 8, 2023 | Completed final sign-off Jul 2026 | 577 Alvarado St | erect a 1 story and 1 dwelling bldg (a detached adu per state adu program) with no basement at rear of existing single family.type v-bDetails
erect a 1 story and 1 dwelling bldg (a detached adu per state adu program) with no basement at rear of existing single family.type v-b | $90,000 |
| Sep 22, 2022 | Completed final sign-off Oct 2025 | 2451 Bay St | recommencement and completion of work approved under pa# 201603071311Details
recommencement and completion of work approved under pa# 201603071311 | $5,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2023 | 1730 Burrows St | proposed conversion of garage into accessory dwelling unit (adu) & remodel of 1st floor. includes plumbing, electrical & structural work per ordinance #95-17. reference pa #202002144568-s deck legalization.Details
proposed conversion of garage into accessory dwelling unit (adu) & remodel of 1st floor. includes plumbing, electrical & structural work per ordinance #95-17. reference pa #202002144568-s deck legalization. | $150,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2023 | 1730 Burrows St | legalization of (e) deck in rear yard. reference pa #202002144565-s conversion of garage to adu per ord 95-17Details
legalization of (e) deck in rear yard. reference pa #202002144565-s conversion of garage to adu per ord 95-17 | $2,000 |
| Sep 10, 2019 | Completed final sign-off Oct 2020 | 51 Pond St | bathroom remodel to include moving interior non-laod bearing wall, new windows of different size & location and new plm fixtures, finishes and cabinetryDetails
bathroom remodel to include moving interior non-laod bearing wall, new windows of different size & location and new plm fixtures, finishes and cabinetry | $20,000 |
| Mar 28, 2019 | Completed final sign-off Oct 2020 | 51 Pond St | relocate existing exterior door & add new landing to existing exterior stairs, add new bath to include plumbing fixtures & finishes.Details
relocate existing exterior door & add new landing to existing exterior stairs, add new bath to include plumbing fixtures & finishes. | $60,000 |
| May 8, 2018 | Completed final sign-off Sep 2018 | 2420 Gough St | shower pan repair (failed old one) renovate 1 bath room in kind - use old sink , old toilet. new shower tile floorsDetails
shower pan repair (failed old one) renovate 1 bath room in kind - use old sink , old toilet. new shower tile floors | $20,000 |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 1832 24th Av | complete one bathroom remodel. demo (e) bath room, remove tub, install new plumbing, electrical. replace shower and shower pan, new tiles, vanity and toilet. no change in walls & openings layout.Details
complete one bathroom remodel. demo (e) bath room, remove tub, install new plumbing, electrical. replace shower and shower pan, new tiles, vanity and toilet. no change in walls & openings layout. | $15,000 |
| Feb 28, 2018 | Completed final sign-off Sep 2018 | 2420 Gough St | residential remodel to include: kitchen remodel including new finishes, cabinetry & appliances. relocaion of (e) non-structural wall; demo of (e) shower & addition of new bathroom vanity; repair dry rot at (e) rear deck-less than 50%, replace in kind.Details
residential remodel to include: kitchen remodel including new finishes, cabinetry & appliances. relocaion of (e) non-structural wall; demo of (e) shower & addition of new bathroom vanity; repair dry rot at (e) rear deck-less than 50%, replace in kind. | $60,000 |
| Jun 14, 2016 | Never finaled issued Jun 2016, no final | 677 Sanchez St | installing (3) lg ductless air conditioners, electrical & plumbing, one main unit, sheetrock & paint.Details
installing (3) lg ductless air conditioners, electrical & plumbing, one main unit, sheetrock & paint. | $20,000 |
| Mar 7, 2016 | Expired or cancelled expired Oct 2025 | 2451 Bay St | interior renovation & addition to 3rd floor @ rear of property. new rear landscaping. 1 new bedroom & 1 new bathroom in addition. ** maher: n/a **Details
interior renovation & addition to 3rd floor @ rear of property. new rear landscaping. 1 new bedroom & 1 new bathroom in addition. ** maher: n/a ** | $429,349 |
| Feb 10, 2016 | Completed final sign-off Jun 2016 | 600 Chestnut St | kitchen remodel at unit #402 with new kitchen fixtures at same location & footprint. electrical to be pulled by licensed electrican. no relocation of plumbing. no new wall and no existing wall relocation. lighting in kitchen remodel shall comply with cec 150.0(k)3.Details
kitchen remodel at unit #402 with new kitchen fixtures at same location & footprint. electrical to be pulled by licensed electrican. no relocation of plumbing. no new wall and no existing wall relocation. lighting in kitchen remodel shall comply with cec 150.0(k)3. | $15,000 |
| Dec 21, 2015 | Completed final sign-off Jun 2016 | 1832 24th Av | demo (e) coutnertops and cabinets, replace with new electrical to be pulled by liscenced electrician. plumbing mot moved using existing locationDetails
demo (e) coutnertops and cabinets, replace with new electrical to be pulled by liscenced electrician. plumbing mot moved using existing location | $25,000 |
| Sep 17, 2015 | Completed final sign-off Nov 2015 | 340 Ritch St | demo (e) kitchen cabinets and countertops- replace with new plumbing and electrical to be pulled by licensed electrical and plumber.Details
demo (e) kitchen cabinets and countertops- replace with new plumbing and electrical to be pulled by licensed electrical and plumber. | $8,000 |
| May 20, 2014 | Never finaled issued Jul 2014, no final | 412 Joost Av | removal of illegal dwellling unit. remove kitchen appliances and replace with cabinets. remove door between upstairs and down stairs to create single living space throughout the bldg.Details
removal of illegal dwellling unit. remove kitchen appliances and replace with cabinets. remove door between upstairs and down stairs to create single living space throughout the bldg. | $500 |
| May 2, 2014 | Completed final sign-off Jun 2014 | 2049 Oak St | kitchen remodel - old cabinets removed, install new cabinets, lighting, plumbing, floor within kitchen. no countertop change in walls & opening layout. kitchen lighting min. 50% wattage to be high efficacy (apt. 1)Details
kitchen remodel - old cabinets removed, install new cabinets, lighting, plumbing, floor within kitchen. no countertop change in walls & opening layout. kitchen lighting min. 50% wattage to be high efficacy (apt. 1) | $8,500 |