Back to kitchen remodel contractors
Brighter Legacy Builders Inc.
- Based in
- Sunnyvale
- On San Francisco permits
- Aug 2020 to Aug 2026
- Last 24 months
- 25 permits filed
43 permits since 2000: 14 completed, 19 in progress, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 6 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 5 completed, 7 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2026 | Completed final sign-off Aug 2026 | 738 Plymouth Av | kitchen and 2bathremodels,likeforlike, update laundry installation in garage area, remodel wet bar sink at basement.replace all light fixtures,add recess lighting 4- kitchen,4-dining room,6-living room, 4-each bedroom.add subpanel for new circuit, new plumbing fixtures.3 windows inkind replace rearDetails
kitchen and 2bathremodels,likeforlike, update laundry installation in garage area, remodel wet bar sink at basement.replace all light fixtures,add recess lighting 4- kitchen,4-dining room,6-living room, 4-each bedroom.add subpanel for new circuit, new plumbing fixtures.3 windows inkind replace rear | $75,000 |
| Apr 28, 2026 | In progress issued Apr 2026 | 1523 10th Av | kitchen update: rewiring, replacing cabinets, countertops, and appliances. indludes updating laundry in kitchen areas, replace 2 interior windows (not street visible).Details
kitchen update: rewiring, replacing cabinets, countertops, and appliances. indludes updating laundry in kitchen areas, replace 2 interior windows (not street visible). | $17,000 |
| Jan 13, 2026 | In progress issued Jan 2026 | 108 Cortland Av | replace interior windows,not street visible.same size and location.replace kitchen cabinets&countertops;same size and location.replace flooring in laundry area & appliances.replace fixtures in bathroom:new shower valve,faucet,toilet&light fixtures.replace flat roof,sister or replate rotten rafters.Details
replace interior windows,not street visible.same size and location.replace kitchen cabinets&countertops;same size and location.replace flooring in laundry area & appliances.replace fixtures in bathroom:new shower valve,faucet,toilet&light fixtures.replace flat roof,sister or replate rotten rafters. | $25,000 |
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 2752 Buchanan St | rev 202507281693: change kitchen layout, relocate skylights, relocate bathroom.Details
rev 202507281693: change kitchen layout, relocate skylights, relocate bathroom. | $5,000 |
| Dec 2, 2025 | Completed final sign-off May 2026 | 232 Gambier St | like for like kitchen & (2) bath remodels. like for like retrofit window for 8 windows. electrical rewire, service upgrade/panel.Details
like for like kitchen & (2) bath remodels. like for like retrofit window for 8 windows. electrical rewire, service upgrade/panel. | $25,000 |
| Aug 7, 2025 | In progress issued Mar 2026 | 60 Farallones St | fire damage, repair @ 1st flr; renovate (e) bathroom & kitchen @ 2nd flr; add new bathroom @ 2nd flr, expand (e) deck by 165 sf.Details
fire damage, repair @ 1st flr; renovate (e) bathroom & kitchen @ 2nd flr; add new bathroom @ 2nd flr, expand (e) deck by 165 sf. | $150,000 |
| Jul 28, 2025 | In progress issued Jul 2025 | 2752 Buchanan St | remodel a bedroom & relocate a bath; add a bedroom, bath, media w/kitchenette w/2 burner stove & sink; replace garage door on 1st floor. remodel/rearrange living dining kitchen bedrooms & bath; add bath & laundry; infill central patio; remove walls; add flat skylights on 2nd fl. remodel/rearrangeDetails
remodel a bedroom & relocate a bath; add a bedroom, bath, media w/kitchenette w/2 burner stove & sink; replace garage door on 1st floor. remodel/rearrange living dining kitchen bedrooms & bath; add bath & laundry; infill central patio; remove walls; add flat skylights on 2nd fl. remodel/rearrange | $300,000 |
| May 21, 2025 | In progress issued May 2025 | 2752 Buchanan St | demo (e) plaster and drywall in the kitchen, dinning, living and bedroom area. install new insulation. install new 5/8 drywall and paint.Details
demo (e) plaster and drywall in the kitchen, dinning, living and bedroom area. install new insulation. install new 5/8 drywall and paint. | $7,000 |
| Nov 14, 2024 | Completed final sign-off Feb 2025 | 239 25th Av | unit #3 replace kitchen cabinets & countertops, update & relocate interior subpanel. add hardwire smoke detector. add recess lights in living room & bedrooms. replace plumbing fixtures at kitchen. everything to remain in same locationDetails
unit #3 replace kitchen cabinets & countertops, update & relocate interior subpanel. add hardwire smoke detector. add recess lights in living room & bedrooms. replace plumbing fixtures at kitchen. everything to remain in same location | $15,000 |
| Oct 4, 2024 | In progress issued Oct 2024 | 60 Farallones St | replace in-kind sheetrock in area due to fire damage including:kitchen walls, br walls, storage room and laundry ceiling and walls in basement; rewiring and replace plumbings in damaged areas per descriptions.replace insulation,drywall,cabinets, paint.replace siding on east side at 1st fl. no struc.Details
replace in-kind sheetrock in area due to fire damage including:kitchen walls, br walls, storage room and laundry ceiling and walls in basement; rewiring and replace plumbings in damaged areas per descriptions.replace insulation,drywall,cabinets, paint.replace siding on east side at 1st fl. no struc. | $87,000 |
| Sep 13, 2023 | Never finaled issued Sep 2023, no final | 722 Masonic Av | unit 722 (1st & 2nd fl) relocate kitchen & remove walls, remodel bath, convert (e) kitchen to a bedroom, convert (e) 2 bedrooms into a master bedroom (n) full bath on 2nd fl. add stairs to 1st fl. add bed rooms and media add kitchenette w/2 burners, stove, no oven, hood,sink, add washier/dryerDetails
unit 722 (1st & 2nd fl) relocate kitchen & remove walls, remodel bath, convert (e) kitchen to a bedroom, convert (e) 2 bedrooms into a master bedroom (n) full bath on 2nd fl. add stairs to 1st fl. add bed rooms and media add kitchenette w/2 burners, stove, no oven, hood,sink, add washier/dryer | $180,000 |
| Sep 13, 2023 | Expired or cancelled cancelled Mar 2024 | 720 Masonic Av | unit 720 (3rd fl) relocate kitchen and bath add a full bath, a bedroom and washer/dryerDetails
unit 720 (3rd fl) relocate kitchen and bath add a full bath, a bedroom and washer/dryer | $100,000 |
| Dec 2, 2022 | Completed final sign-off Mar 2023 | 551 Pennsylvania Av | remodel two bathrooms: two toilets, one shower pan, one tub, two sinks. replace kitchen cabinets and counter tops. replace electrical sub-panel. all appliances and fixtures to be replace in the same location. add (14) recessed lights through out the ceilingDetails
remodel two bathrooms: two toilets, one shower pan, one tub, two sinks. replace kitchen cabinets and counter tops. replace electrical sub-panel. all appliances and fixtures to be replace in the same location. add (14) recessed lights through out the ceiling | $30,000 |
| Jun 22, 2021 | Never finaled issued Jul 2021, no final | 159 Sadowa St | comply w/ nov# 202174425. 2nd floor - remodel kitchen and bath. add one (n) bathm change pantry room to office room.Details
comply w/ nov# 202174425. 2nd floor - remodel kitchen and bath. add one (n) bathm change pantry room to office room. | $80,000 |
| Aug 15, 2020 | Completed final sign-off May 2022 | 221 Ashbury St | rev to pa202002114059: reduce scope of work. remodel kitchen and bathroom, add a new bathroom and relocate washer/dryer in unit 221.delete partition, cancel relocate bath and remodel extg instead and cancel windows.Details
rev to pa202002114059: reduce scope of work. remodel kitchen and bathroom, add a new bathroom and relocate washer/dryer in unit 221.delete partition, cancel relocate bath and remodel extg instead and cancel windows. |