Bright Moon Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2024 to Nov 2025
- Last 24 months
- 4 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 115 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2025 | Completed final sign-off Dec 2025 | 239 Crestmont Dr | repair (e) exterior stair stringer w c8 x 13.75 steel chanelDetails
repair (e) exterior stair stringer w c8 x 13.75 steel chanel | $4,000 |
| Nov 6, 2024 | Completed final sign-off Dec 2024 | 44 Cortland Av | front stairs dryrot repair (less than 50%), window sill dryrot repair, exterior painting, and garage door trim repair.Details
front stairs dryrot repair (less than 50%), window sill dryrot repair, exterior painting, and garage door trim repair. | $30,000 |