Back to bathroom remodel contractors
Brennan Strong Hold Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2012 to Sep 2026
- Last 24 months
- 17 permits filed
109 permits since 2000: 78 completed, 13 in progress, 10 never finaled, 8 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 2 in progress, 1 never finaled. Typically 17 days from filing to permit and 392 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 1391 Vallejo St | remodel units 1391/1393 addition f new bathroom. install new stair to basement connecting 1/f to unit 1931. amend 202608056148 remodel (e) kitchen/bath in both unit.Details
remodel units 1391/1393 addition f new bathroom. install new stair to basement connecting 1/f to unit 1931. amend 202608056148 remodel (e) kitchen/bath in both unit. | $80,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 1391 Vallejo St | 1st & 2nd fl: remove and replace interior finishes, kitchen cabinets, tile, bathroom tile, baseboard mouldings interior doors. two bath and two kitchen replace lath and plaster as needed.Details
1st & 2nd fl: remove and replace interior finishes, kitchen cabinets, tile, bathroom tile, baseboard mouldings interior doors. two bath and two kitchen replace lath and plaster as needed. | $20,000 |
| May 26, 2026 | Completed final sign-off Jul 2026 | 755 Pine St | unit #6: replace kitchen cabinets, sink and appliances. replace bathroom toilet and sink. new flooring.Details
unit #6: replace kitchen cabinets, sink and appliances. replace bathroom toilet and sink. new flooring. | $25,000 |
| Mar 5, 2024 | Completed final sign-off Oct 2025 | 752 27th St | replace all exterior windows and doors. minor interior remodel. replace existing staircase from level 2-3. remodel 3rd fl bathroom and primary bathroom. remodel existing kitchenDetails
replace all exterior windows and doors. minor interior remodel. replace existing staircase from level 2-3. remodel 3rd fl bathroom and primary bathroom. remodel existing kitchen | $550,000 |
| Apr 14, 2023 | Completed final sign-off Nov 2023 | 3231 16th St | rev to pa# 201808076659; revise entry and stair to unit # 401, relocate kitchen, revise bathroom and add laundry closetDetails
rev to pa# 201808076659; revise entry and stair to unit # 401, relocate kitchen, revise bathroom and add laundry closet | |
| Jul 8, 2022 | Completed final sign-off Jan 2023 | 919 Vallejo St | remodel (e) one kitchen and two bathrooms, install new cabinets appliances , tile fixures and paint, remove decorative wainscoating in hallways and living room, patch and paint, no walls to be removed, install hardwood floorsDetails
remodel (e) one kitchen and two bathrooms, install new cabinets appliances , tile fixures and paint, remove decorative wainscoating in hallways and living room, patch and paint, no walls to be removed, install hardwood floors | $90,000 |
| Mar 24, 2022 | Completed final sign-off Mar 2023 | 2525 16th St | basement: m.e.p. installation of fan coils, outside air ventilation, bathroom ventilation, server room condition system and truck workshop ventilation system.Details
basement: m.e.p. installation of fan coils, outside air ventilation, bathroom ventilation, server room condition system and truck workshop ventilation system. | $340,000 |
| Jan 12, 2022 | Completed final sign-off Dec 2024 | 919 Vallejo St | 919a & 923 vallejo street. each unit: remodel (e) 1 kitchen and 1 bathroom. install new cabinets counter top appliance paint tile and new fixtures. no walls to be removed, kitchen and bathrooms to remain in same location.Details
919a & 923 vallejo street. each unit: remodel (e) 1 kitchen and 1 bathroom. install new cabinets counter top appliance paint tile and new fixtures. no walls to be removed, kitchen and bathrooms to remain in same location. | $80,000 |
| Aug 16, 2021 | Completed final sign-off Mar 2023 | 2525 16th St | mep work only. install new fan coils, bathroom, exhaust spiral ducting on partial 2nd floor, partial 3rd and all of 4th floor. deffered mep submittal for app#202012211460 for previously approved scope of work.Details
mep work only. install new fan coils, bathroom, exhaust spiral ducting on partial 2nd floor, partial 3rd and all of 4th floor. deffered mep submittal for app#202012211460 for previously approved scope of work. | $750,000 |
| Aug 6, 2021 | Completed final sign-off Mar 2023 | 2525 16th St | 2/f: installion of (n) fan coiles, bathroom, ventilation, outside air venilation and server room space conditional system. ref deferred submittal to pa 202106233069Details
2/f: installion of (n) fan coiles, bathroom, ventilation, outside air venilation and server room space conditional system. ref deferred submittal to pa 202106233069 | $350,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2022 | 2505 Mariposa St | g/f -replace interior dryrot at bathroom wall approx. 6'. office partition wall approx. 7'; all walls are existing. replace drywall. all walls are non-structural and non-fire rated.Details
g/f -replace interior dryrot at bathroom wall approx. 6'. office partition wall approx. 7'; all walls are existing. replace drywall. all walls are non-structural and non-fire rated. | $15,000 |
| Sep 27, 2018 | Completed final sign-off Mar 2023 | 2525 16th St | 3rd flr - interior non structural ti approx 19,800 sf work to include mech work and upgrades to accessible bathroomDetails
3rd flr - interior non structural ti approx 19,800 sf work to include mech work and upgrades to accessible bathroom | $200,000 |
| Feb 20, 2018 | Completed final sign-off May 2018 | 3233 16th St | upper unit b: kitchen remodel, remove cabinet, appliances, countertop, install new kitchen countertop and appliances. remove bathroom vanity and install new replace tile on wall. no structural work modification.Details
upper unit b: kitchen remodel, remove cabinet, appliances, countertop, install new kitchen countertop and appliances. remove bathroom vanity and install new replace tile on wall. no structural work modification. | $15,000 |
| Oct 21, 2015 | Never finaled issued Jul 2018, no final | 1286 Sanchez St | two-story addition with required structural upgrades. roof deck above 3rd story addition. interior improvement for bedrooms & baths @ 2nd floor. 3 bedrooms & 2 baths.Details
two-story addition with required structural upgrades. roof deck above 3rd story addition. interior improvement for bedrooms & baths @ 2nd floor. 3 bedrooms & 2 baths. | $250,000 |
| Oct 14, 2015 | Completed final sign-off Feb 2017 | 4348 23rd St | remodel extg single family: modify extg walls, remodel and relocate kitchen and bathrooms. replace all window, add dormers, widen garage door. add new bathrooms, bedrooms, modify windows and doors openings at sides and rear.Details
remodel extg single family: modify extg walls, remodel and relocate kitchen and bathrooms. replace all window, add dormers, widen garage door. add new bathrooms, bedrooms, modify windows and doors openings at sides and rear. | $160,000 |
| Dec 24, 2014 | Completed final sign-off Dec 2015 | 298 Alabama St | no exterior changes. structural improvements at basement, 1st floor, 2nd floor, and roof. add bathrooms at 1st and 2nd floor. core and shell improvements amendment to previous permit #201311081568. t.i. work to be submitted under seperate permit. n/a for the maherDetails
no exterior changes. structural improvements at basement, 1st floor, 2nd floor, and roof. add bathrooms at 1st and 2nd floor. core and shell improvements amendment to previous permit #201311081568. t.i. work to be submitted under seperate permit. n/a for the maher | $450,000 |
| Sep 26, 2014 | Completed final sign-off Feb 2016 | 776 Wisconsin St | excavate basement reconfigure front entry & add one additoinal vehicle parking space, add family room, wine cellar and bathroom. add roof deck reconfigure rear deck & interior stairway.Details
excavate basement reconfigure front entry & add one additoinal vehicle parking space, add family room, wine cellar and bathroom. add roof deck reconfigure rear deck & interior stairway. | $350,000 |
| Sep 26, 2013 | Completed final sign-off Jun 2014 | 2 Van Buren St | interior remodel at 1st & 2nd floors. add family room & bathroom at basement. add (n) window at side of bldg. add 3 new windows and 6' french door at rear of bldg. replace (e) alum window with (n) wood clad window @ right side of bldg.Details
interior remodel at 1st & 2nd floors. add family room & bathroom at basement. add (n) window at side of bldg. add 3 new windows and 6' french door at rear of bldg. replace (e) alum window with (n) wood clad window @ right side of bldg. | $200,000 |
| Sep 13, 2012 | Completed final sign-off May 2013 | 3730 Mission St | tenant improvement for existing auto repair shop. new office remodel bath, reinforce mezzanine/storage area structurally; no work to existing pain boothDetails
tenant improvement for existing auto repair shop. new office remodel bath, reinforce mezzanine/storage area structurally; no work to existing pain booth | $100,000 |