Box Canyon Builders Dba The Englander
- Based in
- Mill Valley
- On San Francisco permits
- Jul 2010 to Jul 2026
- Last 24 months
- 5 permits filed
73 permits since 2000: 58 completed, 1 in progress, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 9 completed. Typically 43 days from filing to permit and 450 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2023 | Completed final sign-off Jul 2026 | 78 Fortuna Av | interior alteration including new partitions and structural walls, exterior replacement of doors, windows and finishes. replace existing spiral and deck stairs w/required code upgrades. rear yard deck-replacedecking and any damaged/rotted framingDetails
interior alteration including new partitions and structural walls, exterior replacement of doors, windows and finishes. replace existing spiral and deck stairs w/required code upgrades. rear yard deck-replacedecking and any damaged/rotted framing | $680,000 |
| Mar 29, 2022 | Completed final sign-off Jul 2023 | 3962 Clay St | revision to 202109299463, to reflect correct stair plans & structural updates.Details
revision to 202109299463, to reflect correct stair plans & structural updates. | $2,000 |
| Mar 7, 2022 | Completed final sign-off May 2025 | 1558 Grove St | ground floor expansion at rear and dormer at stair.Details
ground floor expansion at rear and dormer at stair. | $50,000 |
| Nov 19, 2021 | Completed final sign-off Jun 2023 | 3464 Clay St | demolition: a) framing refer to structural drawings for add'l demo scope as reqd for insertion of (n) work. b) plumbing remove (e) fixtures and equipment as reqd for (n) work. replace all (e) toilets. c) flooring remove (e) carpet throughout. remove (e) carpet at all interior stairs.Details
demolition: a) framing refer to structural drawings for add'l demo scope as reqd for insertion of (n) work. b) plumbing remove (e) fixtures and equipment as reqd for (n) work. replace all (e) toilets. c) flooring remove (e) carpet throughout. remove (e) carpet at all interior stairs. | $125,000 |
| Sep 8, 2020 | Completed final sign-off Jan 2022 | 251 Waller St | new skylight in kitchen area, new terrazzo tiling at stairs. revised patio door at backyard. extension of existing roof deck over (e) floor below.Details
new skylight in kitchen area, new terrazzo tiling at stairs. revised patio door at backyard. extension of existing roof deck over (e) floor below. | $50,000 |
| Feb 25, 2016 | Completed final sign-off Jun 2017 | 239 Mallorca Wy | interior renovation of (e) house with some window replacement. interior stair is to be relocated, bathrooms & kitchen are to be renovated. relocate bathroom @ ground floor. no expansion of exterior envelop of bldg. n/a maher ordinanceDetails
interior renovation of (e) house with some window replacement. interior stair is to be relocated, bathrooms & kitchen are to be renovated. relocate bathroom @ ground floor. no expansion of exterior envelop of bldg. n/a maher ordinance | $137,000 |
| Sep 14, 2015 | Completed final sign-off Oct 2016 | 3843 26th St | infill open area below 2nd fl at rear yard to include new bedroom and bath. remove interior walls and reconfigure plan at 2nd fl. relocate int. stairs to 1st flDetails
infill open area below 2nd fl at rear yard to include new bedroom and bath. remove interior walls and reconfigure plan at 2nd fl. relocate int. stairs to 1st fl | $42,000 |
| Sep 11, 2015 | Completed final sign-off Apr 2016 | 9 Bernice St | #9- interior renovation of existing space. reconfigure spaces, framing, interior stair. no exterior work. all work in unit 9 only. n/a ordinance #155-13Details
#9- interior renovation of existing space. reconfigure spaces, framing, interior stair. no exterior work. all work in unit 9 only. n/a ordinance #155-13 | $85,000 |
| Aug 4, 2015 | Completed final sign-off Oct 2016 | 3843 26th St | 1st fl- (n) mudroom under (n) 2nd fl deck. 2nd fl- square diag. corner @ (n) kitchen, remove ext. spiral stairs & add deck w/(n) stairs to yard. construct 1 hr firewall @ east side of (n) deck & stairs.Details
1st fl- (n) mudroom under (n) 2nd fl deck. 2nd fl- square diag. corner @ (n) kitchen, remove ext. spiral stairs & add deck w/(n) stairs to yard. construct 1 hr firewall @ east side of (n) deck & stairs. | $180,000 |