Back to kitchen remodel contractors
Boughton Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Nov 2018
- Last 24 months
- 0 permits filed
56 permits since 2000: 35 completed, 11 never finaled, 10 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 expired or cancelled. Typically 69 days from filing to permit and 314 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2016 | Completed final sign-off Jul 2018 | 514 Congo St | interior remodel of bath & kitchen. horizontal addition @ rear of upper level (n) windows @ selected locations. replace asbestos siding w/ woodDetails
interior remodel of bath & kitchen. horizontal addition @ rear of upper level (n) windows @ selected locations. replace asbestos siding w/ wood | $25,000 |
| Mar 1, 2016 | Completed final sign-off Mar 2017 | 163 Alhambra St | remodel kitchen, bath and water closet room. replace all windows in kind. no structural. front windows not to be replaced or changed.Details
remodel kitchen, bath and water closet room. replace all windows in kind. no structural. front windows not to be replaced or changed. | $108,000 |
| Oct 14, 2014 | Completed final sign-off Nov 2015 | 149 19th Av | kitchen remodel, replace window and new window.Details
kitchen remodel, replace window and new window. | $45,000 |
| Jan 27, 2011 | Completed final sign-off Sep 2011 | 1105 Castro St | new kitchen,bath, laundry, den, hall on 3rd floor. remove bearing wall.Details
new kitchen,bath, laundry, den, hall on 3rd floor. remove bearing wall. | $55,000 |
| Mar 11, 2009 | Expired or cancelled expired Feb 2016 | 1011 Castro St | new kitchen cabinets, lighting, appliances,some plumbing. new floor on 2nd floor. new carpet on 3rd floor. add electrical on 3rd floor. reframe some walls, build new closet. sheet rockDetails
new kitchen cabinets, lighting, appliances,some plumbing. new floor on 2nd floor. new carpet on 3rd floor. add electrical on 3rd floor. reframe some walls, build new closet. sheet rock | $25,000 |
| Nov 21, 2007 | Completed final sign-off Jan 2009 | 36 Macondray Ln | revision to appl #200702134043 & 9419691: int.remodel incl baths, on 1st, 2nd, 4th floor & kitchen on 2nd floor, replacement of selected windows. enclose 1st floor passageway & 2nd floor entry, repalce skylight & window on 2nd floor, remodel 3rd floor utility closet, repalce selected light fixturesDetails
revision to appl #200702134043 & 9419691: int.remodel incl baths, on 1st, 2nd, 4th floor & kitchen on 2nd floor, replacement of selected windows. enclose 1st floor passageway & 2nd floor entry, repalce skylight & window on 2nd floor, remodel 3rd floor utility closet, repalce selected light fixtures | $100,000 |
| Apr 20, 2001 | Completed final sign-off Feb 2002 | 363 Jersey St | remodel kitchen- replace (e) windows & sliding door w/insul. unitsDetails
remodel kitchen- replace (e) windows & sliding door w/insul. units | $18,500 |