Back to bathroom remodel contractors
Bonilla Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Sep 2026
- Last 24 months
- 15 permits filed
104 permits since 2000: 63 completed, 12 in progress, 26 never finaled, 3 expired or cancelled.
Of the 26 never-finaled permits, 2 are 3 to 5 years old, 16 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 13 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 625 Hyde St | 7 kitchen and 7 bathrooms to be remodeled in kind. no moving walls. each kitchen approx. 100 sq ft. each bathroom approx. 40 sq ft.Details
7 kitchen and 7 bathrooms to be remodeled in kind. no moving walls. each kitchen approx. 100 sq ft. each bathroom approx. 40 sq ft. | $15,000 |
| Jun 8, 2026 | Completed final sign-off Aug 2026 | 1360 Clayton St | unit #3: 2 partial bathroom remodels, like for like. floor tile replacement, toilet replacement, sink and cabinet replacement, and wall light replacements. scope for only work stated.Details
unit #3: 2 partial bathroom remodels, like for like. floor tile replacement, toilet replacement, sink and cabinet replacement, and wall light replacements. scope for only work stated. | $12,000 |
| Oct 31, 2024 | In progress issued Oct 2024 | 418 Jessie St | replace kitchen cabinets. in kind replacement, no walls to remove, replace bathroom cabientry, replacement of all bathroom fixtures,replace kitchen sink sink and faucet. addion of electrical outlet throughout/ relocate sub electrical panel from bedroom to kitchen. new no load bearim wall at bedroom.Details
replace kitchen cabinets. in kind replacement, no walls to remove, replace bathroom cabientry, replacement of all bathroom fixtures,replace kitchen sink sink and faucet. addion of electrical outlet throughout/ relocate sub electrical panel from bedroom to kitchen. new no load bearim wall at bedroom. | $30,500 |
| May 3, 2024 | Completed final sign-off Dec 2024 | 1635 Pierce St | apt 4: dry wall repair at bathroom. bathroom fan replacement. install gas wall heater. this application is to comply w/#2 compliant 202419934Details
apt 4: dry wall repair at bathroom. bathroom fan replacement. install gas wall heater. this application is to comply w/#2 compliant 202419934 | $1,800 |
| Jan 11, 2023 | Never finaled filed Jan 2023, never issued | 43 Brighton Av | to comply with nov# 202295342, legalize 2 bedrooms and 1 bathroom on ground lvl, install bathroom fan and 20 mins fire rated door.Details
to comply with nov# 202295342, legalize 2 bedrooms and 1 bathroom on ground lvl, install bathroom fan and 20 mins fire rated door. | $1,200 |
| Jun 15, 2021 | Completed final sign-off Jun 2023 | 45 Bemis St | amend to pa202103267383: interior remodel - partial reconfig of (e) bath & kitchen. new partitions.replace non-conforming stairs with (n) stairs. no ext work. no new aera. (e) wdws & ext doors to remain. partial voluntary foundatoin / structural update ssd.Details
amend to pa202103267383: interior remodel - partial reconfig of (e) bath & kitchen. new partitions.replace non-conforming stairs with (n) stairs. no ext work. no new aera. (e) wdws & ext doors to remain. partial voluntary foundatoin / structural update ssd. | $60,000 |
| Mar 26, 2021 | Completed final sign-off Jun 2023 | 45 Bemis St | electrical rewiring, open walls/ceiling, hang new drywall/insulation, approx 1,200 sq. ft., sheetrock 5/8", type x @ property line, remodel kitchen & bathroom, no new walls/wall relocationDetails
electrical rewiring, open walls/ceiling, hang new drywall/insulation, approx 1,200 sq. ft., sheetrock 5/8", type x @ property line, remodel kitchen & bathroom, no new walls/wall relocation | $40,000 |
| Nov 16, 2020 | Completed final sign-off Aug 2021 | 2308 San Bruno Av | 3rd flr: remodel baths and bedroom. relocate kitchen and dining. add 3 bedrooms, media and 1 full bath.Details
3rd flr: remodel baths and bedroom. relocate kitchen and dining. add 3 bedrooms, media and 1 full bath. | $65,000 |
| Aug 8, 2018 | Expired or cancelled suspend Jun 2025 | 1500 Powell St | finalize all work under permit #201609168035 for rooms 2,8,9,12 1/2,11,21,24,26,28: repair drywall, rewire units, replace bathrooms, toilets, sinks, shower pans and tile, replace common kitchen cabinet sinks on 2nd and 3rd floor.Details
finalize all work under permit #201609168035 for rooms 2,8,9,12 1/2,11,21,24,26,28: repair drywall, rewire units, replace bathrooms, toilets, sinks, shower pans and tile, replace common kitchen cabinet sinks on 2nd and 3rd floor. | |
| Jul 30, 2018 | Never finaled issued Jul 2018, no final | 1449 Powell St | room 3, 5, 26, 30. new drywall, electrical rewire, sink replace. vent add one light to cmply with nov# 201880811. room 24 new drywall, electrical rewire, replace toilet bath tub and sink. room 25 new drywall, replace 3 kitchen cabinets, replace bath fixtures and electrical rewire.Details
room 3, 5, 26, 30. new drywall, electrical rewire, sink replace. vent add one light to cmply with nov# 201880811. room 24 new drywall, electrical rewire, replace toilet bath tub and sink. room 25 new drywall, replace 3 kitchen cabinets, replace bath fixtures and electrical rewire. | $35,000 |
| Feb 9, 2015 | Completed final sign-off May 2015 | 297 Addison St | bathroom remodel - new bath tub, new toilet, new sink, new bathroom fan, new light fixtures and heat for under tile floor, new wall tile.Details
bathroom remodel - new bath tub, new toilet, new sink, new bathroom fan, new light fixtures and heat for under tile floor, new wall tile. | $12,000 |
| Nov 15, 2012 | Completed final sign-off Mar 2016 | 383 Fair Oaks St | to comply with nov# 201102941, nov# 201197026 & nov# 200990223. remodel 1st & 2nd floor.(kitchen, bathroom, add closets) add 2nd residential unit @ garden level. demo (e) deck & stairs @ rear yard. horizontal addition @ garden level & 1st floor. (n) decks & stairs @ rear yard.Details
to comply with nov# 201102941, nov# 201197026 & nov# 200990223. remodel 1st & 2nd floor.(kitchen, bathroom, add closets) add 2nd residential unit @ garden level. demo (e) deck & stairs @ rear yard. horizontal addition @ garden level & 1st floor. (n) decks & stairs @ rear yard. | $200,000 |
| Jun 26, 2012 | Completed final sign-off Nov 2012 | 554 Magellan Av | one bathroom remodel: new shower valve, new sink, new fan and one light and electrical plug, new tile. one partial kitchen remodel: new countertop, new light and electrical plugs. keep existing sink and cabinets.Details
one bathroom remodel: new shower valve, new sink, new fan and one light and electrical plug, new tile. one partial kitchen remodel: new countertop, new light and electrical plugs. keep existing sink and cabinets. | $2,500 |
| Jan 3, 2012 | Completed final sign-off Dec 2012 | 2130 Leavenworth St | apt #4 - renovate existing bedroom, bath, and closet. remove non structural walls in bathroom and dinng room and upgrade interior lighting. installation of a vent free combo electrical washer & dryer.Details
apt #4 - renovate existing bedroom, bath, and closet. remove non structural walls in bathroom and dinng room and upgrade interior lighting. installation of a vent free combo electrical washer & dryer. | $35,888 |
| Sep 23, 2011 | Completed final sign-off Apr 2012 | 301 Congdon St | comply with notice of violation #200988700, dated 1.28.2009. removal of illegal rooms at ground floor convert (e) rooms to garage & storage, convert full bath to a half bath at ground floor. removal of some interior non-bearing walls.Details
comply with notice of violation #200988700, dated 1.28.2009. removal of illegal rooms at ground floor convert (e) rooms to garage & storage, convert full bath to a half bath at ground floor. removal of some interior non-bearing walls. | $7,000 |
| Jul 18, 2011 | Completed final sign-off Nov 2013 | 1594 Market St | remodel (e) commercial space to cafe. add 1-unisex bathroom, counters, built-in benches & kitchen equipment @ prep. area. mep under separate permit.Details
remodel (e) commercial space to cafe. add 1-unisex bathroom, counters, built-in benches & kitchen equipment @ prep. area. mep under separate permit. | $40,000 |
| Nov 6, 2009 | Completed final sign-off May 2010 | 140 Kingston St | to comply w/nov #200921161: remove illegal built kitchen & shower in ground floor, legalize (e) bathroom at ground floor, repair water seepage from (e) foundation to interior walls at ne corner & ne corner.Details
to comply w/nov #200921161: remove illegal built kitchen & shower in ground floor, legalize (e) bathroom at ground floor, repair water seepage from (e) foundation to interior walls at ne corner & ne corner. | $5,000 |
| Jun 5, 2007 | Completed final sign-off Apr 2009 | 3153 Alemany Bl | addition to rear of house, 2 stories, new bedroom suites, family room, bathsDetails
addition to rear of house, 2 stories, new bedroom suites, family room, baths | $300,000 |