Back to bathroom remodel contractors
Bolter Builders Inc
- Based in
- Fairfax
- On San Francisco permits
- Jun 2016 to Feb 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 340 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2022 | Completed final sign-off Jan 2023 | 1201 California St | remodel of existing storage closet into water closet with toilet & sink,half bath.Details
remodel of existing storage closet into water closet with toilet & sink,half bath. | $18,000 |
| Nov 15, 2021 | Completed final sign-off Feb 2023 | 1201 California St | apt 1203. remodel three bathrooms including new shower trim, shower pan and tiles plumbing fixtures to remain in same location. remodel in-kind.Details
apt 1203. remodel three bathrooms including new shower trim, shower pan and tiles plumbing fixtures to remain in same location. remodel in-kind. | $65,000 |
| Jul 12, 2021 | Completed final sign-off Jul 2022 | 420 Mission Bay Blvd North Bl | kitchen & bathroom rmeodel. no layout changes to kitchen: new countertop, backsplash and cibnet faces. 1 bathroom change tub shower to walkin shower. new tile in entire bathroom. add overhead lighting & new vanity and fan. non-structural work.Details
kitchen & bathroom rmeodel. no layout changes to kitchen: new countertop, backsplash and cibnet faces. 1 bathroom change tub shower to walkin shower. new tile in entire bathroom. add overhead lighting & new vanity and fan. non-structural work. | $50,000 |
| Aug 18, 2016 | Completed final sign-off Feb 2017 | 626 05th Av | remove (e) fireplace and non-bearing walls of guest, hall and master closets. build new master bathroom, master closet and guest closet & laundry. remove and replace (e) 100 amp main service with new 200 amp main serviceDetails
remove (e) fireplace and non-bearing walls of guest, hall and master closets. build new master bathroom, master closet and guest closet & laundry. remove and replace (e) 100 amp main service with new 200 amp main service | $40,000 |