Bolter Builders Inc
- Based in
- Fairfax
- On San Francisco permits
- Jun 2016 to Feb 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2022 | Completed final sign-off Jan 2023 | 1201 California St | remodel of existing storage closet into water closet with toilet & sink,half bath.Details
remodel of existing storage closet into water closet with toilet & sink,half bath. | $18,000 |
| Nov 15, 2021 | Completed final sign-off Feb 2023 | 1201 California St | apt 1203. remodel three bathrooms including new shower trim, shower pan and tiles plumbing fixtures to remain in same location. remodel in-kind.Details
apt 1203. remodel three bathrooms including new shower trim, shower pan and tiles plumbing fixtures to remain in same location. remodel in-kind. | $65,000 |
| Jul 12, 2021 | Completed final sign-off Jul 2022 | 420 Mission Bay Blvd North Bl | kitchen & bathroom rmeodel. no layout changes to kitchen: new countertop, backsplash and cibnet faces. 1 bathroom change tub shower to walkin shower. new tile in entire bathroom. add overhead lighting & new vanity and fan. non-structural work.Details
kitchen & bathroom rmeodel. no layout changes to kitchen: new countertop, backsplash and cibnet faces. 1 bathroom change tub shower to walkin shower. new tile in entire bathroom. add overhead lighting & new vanity and fan. non-structural work. | $50,000 |
| Feb 26, 2019 | Never finaled issued Feb 2019, no final | 519 38th Av | rot repair at (e) deck. replace damaged rotting siding on back and side of house & all of 3rd flrr. replace any rotting plywood discovered. replace all damaged windows on back of house and 1 sliding glass door. windows and doors to be replaced are not visable from the street. deck repair less 50%Details
rot repair at (e) deck. replace damaged rotting siding on back and side of house & all of 3rd flrr. replace any rotting plywood discovered. replace all damaged windows on back of house and 1 sliding glass door. windows and doors to be replaced are not visable from the street. deck repair less 50% | $10,000 |
| May 15, 2017 | Completed final sign-off Oct 2017 | 624 Monterey Bl | to comply with physical inspection report #cc-8106. items #1-5.Details
to comply with physical inspection report #cc-8106. items #1-5. | $3,500 |
| Dec 6, 2016 | Never finaled issued Dec 2016, no final | 547 21st Av | revision to pa# 201606220634. voluntary strengthening per cebc app a3. work includes foundatoin bolts, shearwall and framing per plans. this permit is for work to be performed in general conformance with the california existing bldg code, , appendix chapter a3csfbc ab-108.Details
revision to pa# 201606220634. voluntary strengthening per cebc app a3. work includes foundatoin bolts, shearwall and framing per plans. this permit is for work to be performed in general conformance with the california existing bldg code, , appendix chapter a3csfbc ab-108. | $2,500 |
| Aug 18, 2016 | Completed final sign-off Feb 2017 | 626 05th Av | remove (e) fireplace and non-bearing walls of guest, hall and master closets. build new master bathroom, master closet and guest closet & laundry. remove and replace (e) 100 amp main service with new 200 amp main serviceDetails
remove (e) fireplace and non-bearing walls of guest, hall and master closets. build new master bathroom, master closet and guest closet & laundry. remove and replace (e) 100 amp main service with new 200 amp main service | $40,000 |
| Jun 22, 2016 | Never finaled issued Aug 2016, no final | 547 21st Av | strengthening per drawings and shearwll with 1/2" apacdx naild with 10 d's @ 6" at center on edges and 12" at center in field. per drawings bolt down mud sil using 5/8" anchoring rods and epoxy embeded 14" into existing concrete. cebc appendix a3(ab-108).Details
strengthening per drawings and shearwll with 1/2" apacdx naild with 10 d's @ 6" at center on edges and 12" at center in field. per drawings bolt down mud sil using 5/8" anchoring rods and epoxy embeded 14" into existing concrete. cebc appendix a3(ab-108). | $4,000 |