Blue Lotus Project
- Based in
- Alameda
- On San Francisco permits
- Feb 2009 to Nov 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2010 | Completed final sign-off Mar 2011 | 1970 32nd Av | minor kitchen remodel: replace cabinets, refrigerator, sink, new flooring. new recessed lights. no work in other areas of home. new range hood. min. 50% of kitchen lights (per wattage) shall be of high efficacy lights.Details
minor kitchen remodel: replace cabinets, refrigerator, sink, new flooring. new recessed lights. no work in other areas of home. new range hood. min. 50% of kitchen lights (per wattage) shall be of high efficacy lights. | $30,000 |