Blue Birds Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2006 to May 2026
- Last 24 months
- 9 permits filed
63 permits since 2000: 48 completed, 5 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 8 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 28 days from filing to permit and 398 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2025 | In progress issued Sep 2025 | 530 26th Av | construct 2 bedroom, 2 bathroom, family room, & install wetbar (including 1 bedroom in-fill) at g/f. remodel (e) staircase from 2/f rear deck down to backyard.Details
construct 2 bedroom, 2 bathroom, family room, & install wetbar (including 1 bedroom in-fill) at g/f. remodel (e) staircase from 2/f rear deck down to backyard. | $167,000 |
| Dec 16, 2021 | Completed final sign-off Nov 2023 | 174 Naples St | 1 st fl: layout renovation (372 sf addition). relocate (e) bath to new location. new family rm, (e) deck modify. windows replacement. 2nd fl: layout renovation. new bath @ new master room , new location for kitchen, new stairs.Details
1 st fl: layout renovation (372 sf addition). relocate (e) bath to new location. new family rm, (e) deck modify. windows replacement. 2nd fl: layout renovation. new bath @ new master room , new location for kitchen, new stairs. | $90,000 |
| Apr 14, 2021 | Completed final sign-off Jan 2023 | 336 Lakeview Av | per ca government code section 65852.2. convert (e) garage & storage space into one new adu. new unit within (e) footprint to include bedrooms, bathroom, kitchen. removed (e) interior stair. new front entry door. new deck, interior remodel, and structural under sep. permit #202202053553.Details
per ca government code section 65852.2. convert (e) garage & storage space into one new adu. new unit within (e) footprint to include bedrooms, bathroom, kitchen. removed (e) interior stair. new front entry door. new deck, interior remodel, and structural under sep. permit #202202053553. | $15,000 |
| Mar 25, 2021 | Completed final sign-off Feb 2024 | 1627 Santiago St | enclose existing east side light-well @ ground floor. construct new deck on newly enclosed light-well. add steel beam on ground floor ceiling. construct new habitable (bedroom & great room) space behind garage. add new laundry in garage. reconfigure existing interior staircase.Details
enclose existing east side light-well @ ground floor. construct new deck on newly enclosed light-well. add steel beam on ground floor ceiling. construct new habitable (bedroom & great room) space behind garage. add new laundry in garage. reconfigure existing interior staircase. | $100,000 |
| Jun 27, 2019 | Completed final sign-off Jul 2020 | 2307 27th Av | replace (e) deteriorated dry rot front stair in kind, style and material match (e); replace (e) front window w/alum clad wood window in kindDetails
replace (e) deteriorated dry rot front stair in kind, style and material match (e); replace (e) front window w/alum clad wood window in kind | $15,000 |
| May 24, 2019 | Never finaled issued Jul 2019, no final | 1859 39th Av | 2nd flr-remove wall btw (e) liv rm & (e) kitchen, relocate kitchen & wh & furnace.(n)int stair to gnd flr. (n) deck at rear yd extend appx 23'-7" 9' above grd. swap locations of toilet/sink om bath 1. gnd flr - demo (e) laundry,(e) storage rm 1 & 2, (e) 1/2 bath and construct new full bath/ 2 bedrmsDetails
2nd flr-remove wall btw (e) liv rm & (e) kitchen, relocate kitchen & wh & furnace.(n)int stair to gnd flr. (n) deck at rear yd extend appx 23'-7" 9' above grd. swap locations of toilet/sink om bath 1. gnd flr - demo (e) laundry,(e) storage rm 1 & 2, (e) 1/2 bath and construct new full bath/ 2 bedrms | $20,000 |
| May 6, 2019 | Completed final sign-off Jul 2020 | 2307 27th Av | 1/fl: excavate earth for 8'-0" ch. new living space, construct new 2 bedrooms, 2 bathrooms, 1 media & home office. 2/f: remodel (e) kitchen and bathroom, 1 new bathroom and half bath, new stair and 1-level deck. infill lightwell.Details
1/fl: excavate earth for 8'-0" ch. new living space, construct new 2 bedrooms, 2 bathrooms, 1 media & home office. 2/f: remodel (e) kitchen and bathroom, 1 new bathroom and half bath, new stair and 1-level deck. infill lightwell. | $98,000 |
| Apr 18, 2019 | Expired or cancelled suspend Jun 2019 | 2408 Moraga St | relocate kitchen and bathroom , add two & half bathroom, relocate interior stair, construct a rear deck with stair on the 2nd fl. add a media room, two bedrooms, a storage room and two full bathroom on 1st floor, install 4 skylights. demo and replace (e) driveway.Details
relocate kitchen and bathroom , add two & half bathroom, relocate interior stair, construct a rear deck with stair on the 2nd fl. add a media room, two bedrooms, a storage room and two full bathroom on 1st floor, install 4 skylights. demo and replace (e) driveway. | $120,000 |
| Oct 24, 2018 | Completed final sign-off May 2025 | 57 Niagara Av | comply with nov# 200337276 & 2018008994 enf. remove non-prmtd rear addition at 1st flr. construct 2 (n) bedrooms, 2 (n) bathrooms, family room and study. 2nd flr- remodel / relocate (e) kitchen and bath. 3rd flr- remodel (e) bedrms and baths, new interior stair.Details
comply with nov# 200337276 & 2018008994 enf. remove non-prmtd rear addition at 1st flr. construct 2 (n) bedrooms, 2 (n) bathrooms, family room and study. 2nd flr- remodel / relocate (e) kitchen and bath. 3rd flr- remodel (e) bedrms and baths, new interior stair. | $99,000 |
| Apr 24, 2018 | Completed final sign-off Feb 2019 | 2434 42nd Av | res int remodel of structure and add of habitable space on grnd flr. new 2 bedrms, 2 bath on grnd flr. remodel of 2nd flr w/new 1 bath and skylights. new rear deck w/stairs at rear of (e) bld per plan. new fill in of open area under cantilevered rm. replace windows in kind at front of (e) bldDetails
res int remodel of structure and add of habitable space on grnd flr. new 2 bedrms, 2 bath on grnd flr. remodel of 2nd flr w/new 1 bath and skylights. new rear deck w/stairs at rear of (e) bld per plan. new fill in of open area under cantilevered rm. replace windows in kind at front of (e) bld | $100,000 |
| Sep 5, 2017 | Completed final sign-off Aug 2018 | 783 Lakeview Av | revision to 200610124807 at rear of building, modify e basement to new library, family room and bath with new interior stairDetails
revision to 200610124807 at rear of building, modify e basement to new library, family room and bath with new interior stair | $50,000 |