Back to bathroom remodel contractors
Blue Bend Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Jun 2026
- Last 24 months
- 3 permits filed
32 permits since 2000: 20 completed, 5 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 5 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 9 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2024 | Completed final sign-off Dec 2024 | 532 08th Av | remodel e bath, removing jacuzzi. new fixtures, vanity, shower. toilet to be installed at same locationDetails
remodel e bath, removing jacuzzi. new fixtures, vanity, shower. toilet to be installed at same location | $30,000 |
| Nov 24, 2020 | Expired or cancelled cancelled Jan 2026 | 555 Moultrie St | remodel kitchen & bathroom on 1/f, reconstrutt roof of popout structure. new side deck & stair to rear yard. structural & lateral upgrades required.Details
remodel kitchen & bathroom on 1/f, reconstrutt roof of popout structure. new side deck & stair to rear yard. structural & lateral upgrades required. | $135,000 |
| Jun 11, 2020 | In progress issued Dec 2023 | 262 Lexington St | add adu within the existing 1st fl as per gov. code sect. 65852.2. the unit will containg living- dining, kitchen, bath and bedroom.additional 1st floor area to be storage space.new adu to be sprinkled as per 2016 nfpa 13 include adjacent egress path. v. huang reviewed site p/a, dmj 02/07/2024;Details
add adu within the existing 1st fl as per gov. code sect. 65852.2. the unit will containg living- dining, kitchen, bath and bedroom.additional 1st floor area to be storage space.new adu to be sprinkled as per 2016 nfpa 13 include adjacent egress path. v. huang reviewed site p/a, dmj 02/07/2024; | $75,000 |
| Apr 25, 2019 | Completed final sign-off Jun 2019 | 185 Miraloma Dr | remodel bathroom ; replace with new toilet , vanity , shower, tile & paint.Details
remodel bathroom ; replace with new toilet , vanity , shower, tile & paint. | $12,000 |
| May 31, 2018 | Expired or cancelled cancelled Jan 2026 | 855 Fell St | revision to 201803305076 add second bathroom shower vanity toilet 1st flrDetails
revision to 201803305076 add second bathroom shower vanity toilet 1st flr | $8,000 |
| May 17, 2018 | Completed final sign-off Oct 2021 | 19 Miguel St | enclose two existing decks. remodel three bathroomsDetails
enclose two existing decks. remodel three bathrooms | $125,000 |
| Sep 26, 2017 | Completed final sign-off Oct 2018 | 549 Chestnut St | remodel kitchen & existing bath. one new bath. electrical & lighting, plumbing and floor finishes, replace doors. maher naDetails
remodel kitchen & existing bath. one new bath. electrical & lighting, plumbing and floor finishes, replace doors. maher na | $150,000 |
| Jul 18, 2016 | Never finaled issued Jul 2016, no final | 32 Church St | revision to pa 2016-0526-8422, (n) skylight in bathroom on 2nd floor. (n) beam @ 1st floor-wall removalDetails
revision to pa 2016-0526-8422, (n) skylight in bathroom on 2nd floor. (n) beam @ 1st floor-wall removal | $2,500 |
| May 26, 2016 | Completed final sign-off Feb 2017 | 32 Church St | 2nd floor interior remodel: (e) bath remodel. bath addition. new skylight. paint all (e) bedrooms & home office.Details
2nd floor interior remodel: (e) bath remodel. bath addition. new skylight. paint all (e) bedrooms & home office. | $60,000 |