Block Nine Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2019 to Nov 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 110 days from filing to permit and 464 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2019 | Completed final sign-off Jun 2021 | 170 10th Av | revision to pa# 2013-0320-2671: front facade material change from stucco to siding. eliminate steps @ front of building. new radiant heat system for both units. rearrange 1st floor layout. revise interior connection. eliminate and resize window @ 2nd floor. reconfigure exterior stair to rear yardDetails
revision to pa# 2013-0320-2671: front facade material change from stucco to siding. eliminate steps @ front of building. new radiant heat system for both units. rearrange 1st floor layout. revise interior connection. eliminate and resize window @ 2nd floor. reconfigure exterior stair to rear yard |