Back to bathroom remodel contractors
Black Oak Construction
- Based in
- Oakland
- On San Francisco permits
- Sep 2012 to Mar 2025
- Last 24 months
- 2 permits filed
20 permits since 2000: 16 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 1 in progress, 1 never finaled. Typically 3 days from filing to permit and 207 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2025 | Completed final sign-off Apr 2025 | 568 Belvedere St | responding to complaint 2025-35407 to remove and replace a ventless w/d that was installed without permits in a closet at the corner of the kitchen (adjacent to bathroom), no wall demolition or construction, no othe work proposed or authorized.Details
responding to complaint 2025-35407 to remove and replace a ventless w/d that was installed without permits in a closet at the corner of the kitchen (adjacent to bathroom), no wall demolition or construction, no othe work proposed or authorized. | $1,500 |
| Mar 26, 2024 | In progress issued Mar 2024 | 111 Genebern Wy | legalization of previous bathroom remodel & associated electricial panel work prior to new ownership. owner needs "code check" for "meter release" & bath workDetails
legalization of previous bathroom remodel & associated electricial panel work prior to new ownership. owner needs "code check" for "meter release" & bath work | $8,000 |
| Jul 5, 2022 | Never finaled issued Jul 2022, no final | 204 Anderson St | remodel all parts of 1 kitchen & 1 bathroom. includes electrical panel upgrade. non structralDetails
remodel all parts of 1 kitchen & 1 bathroom. includes electrical panel upgrade. non structral | $46,500 |
| Nov 10, 2020 | Completed final sign-off Aug 2024 | 439 43rd Av | 3rd floor bathroom remodel. convert (e) storage space at the ground floor level to an adu w/ a (n) deck. ordinance 162-16Details
3rd floor bathroom remodel. convert (e) storage space at the ground floor level to an adu w/ a (n) deck. ordinance 162-16 | $130,000 |
| Oct 31, 2020 | Completed final sign-off Mar 2021 | 757 Ulloa St | rev to no-plan pa# 202007079739: work under this permit:- replace kitchen window, elevated header, expend width. replace (e) slider w/ single hung & 1 main door. no change to overall header width/height. remove bathroom main door & replace w/ single hung window. replace bathroom window at side.Details
rev to no-plan pa# 202007079739: work under this permit:- replace kitchen window, elevated header, expend width. replace (e) slider w/ single hung & 1 main door. no change to overall header width/height. remove bathroom main door & replace w/ single hung window. replace bathroom window at side. | $4,890 |
| Jul 7, 2020 | Completed final sign-off Mar 2021 | 757 Ulloa St | remodel bathroom: move sink, toilet, waterproof shower in bathrom, new fan, new light. remodel kitchen: move d/w, move sink & lighting. all in kind. no layout changes or walls infilled or modified.Details
remodel bathroom: move sink, toilet, waterproof shower in bathrom, new fan, new light. remodel kitchen: move d/w, move sink & lighting. all in kind. no layout changes or walls infilled or modified. | $32,000 |
| Jul 20, 2017 | Completed final sign-off Feb 2018 | 87 Manchester St | bathroom remodeling - updating finishes with no structural changes, no changes to framing at all. no plumbing, mech, or electrical changes.Details
bathroom remodeling - updating finishes with no structural changes, no changes to framing at all. no plumbing, mech, or electrical changes. | $22,300 |
| Jun 12, 2015 | Completed final sign-off Oct 2015 | 2250 24th St | all interior cosmetic work. replace kitchen, layout will stay the same. flooring, cabinets, counter, paint, appliances. bathroom: flooring, bathtub, vanity, tile. paint and flooring throughout whole appartment.Details
all interior cosmetic work. replace kitchen, layout will stay the same. flooring, cabinets, counter, paint, appliances. bathroom: flooring, bathtub, vanity, tile. paint and flooring throughout whole appartment. | $40,000 |
| Apr 4, 2014 | Completed final sign-off Feb 2015 | 209 Elsie St | remove existing drywall and alter framing at existing space to install new plumbing and electrical for new bathroom with shower, vanity sink, and toilet. closet space to be added at adjacent attic space. add skylight.Details
remove existing drywall and alter framing at existing space to install new plumbing and electrical for new bathroom with shower, vanity sink, and toilet. closet space to be added at adjacent attic space. add skylight. | $25,000 |